Accessibility Problem
Southeast corner of S Adams & Adams Hill Circle intersection north of the roundabout on Tapp road.
- Case Date:
- 8/25/2024
Multi - use path is below concrete curb, not accessible like all other corners at intersection.
Parks & Playgrounds
Southeast park playground
- Case Date:
- 7/25/2024
There are many thorny weeds in the play area of southeast park playground. They are a hazard for children. Please remove ASAP
Utilities Construction
Spicewood Ln
- Case Date:
- 7/3/2024
There was a utility project in the Spicewood subdivision over the winter. The streets through the neighborhood have been severely damaged. I looked on the city paving schedule and did not see a project listed to fix the damage that was caused by the project. Is the city coming back to fix the roads? It's huge eyesore and really poor patching jobs for the damage that was done.
Potholes, Other Street Repair
Spicewood Ln
- Case Date:
- 7/29/2024
The streets have huge potholes and uneven surfaces on Roundhill, Spicewood and some of the cul-de-sacs. Can city please repair/patch? Thanks.
Potholes, Other Street Repair
Spicewood Ln
- Case Date:
- 8/2/2024
Is there any plan to repair Spicewood Ln, Roundhill, and Roundhill Ct from the utility work that was completed months ago? The unfinished pavement along streets are bad and the area at the inter of Spicewood and Roundhill are particularly bad.
Potholes, Other Street Repair
Spicewood Ln
- Case Date:
- 8/19/2024
Our roads were cut for utility work 4 months ago and still have not been repaired. This is causing traffic flow issues, etc.
Potholes, Other Street Repair
Spicewood Ln
- Case Date:
- 9/4/2024
The city of Bloomington utilities replace many water mains in April. Our asphalt has still not been repaired and replaced.
Potholes, Other Street Repair
Spicewood Ln
- Case Date:
- 9/4/2024
The city of Bloomington utilities replace many water mains in April. Our asphalt has still not been repaired and replaced.
Utility Construction Projects
Spicewood Ln
- Case Date:
- 10/4/2024
There is a utility project happening in the Spicewood subdivision. The yard repair after digging up holes is not up to standard. Instead of smoothing the yard out, big clumps of dirt are being left with straw thrown in them. Yards need to be left in the same or better condition than they were before the project began. The dirt should be smooth and tamped down, excavator tracks in the yards need to be repaired. Please make sure the remaining properties are repaired up to standard and left in the same or better condition prior to the project.
Traffic Suggestions
SpringHill Suites by Marriott-Bloomington
- Case Date:
- 1/28/2019
For the love of Bloomington, can we please get cross-walk lights on tenth? Especially in front of the library. It would make driving easier and regulate the wave of students jumping in front of cars to cross the street.