closed #199334

City Construction Projects

1326 S Dunn ST

Case Date:
11/12/2024

The crews installing fiber have left multiple construction signs in this general vicinity from Dunn heading to the west at least one block- they have been abandoned for over a month

closed #199694

City Construction Projects

2801 E David DR

Case Date:
12/17/2024

Metal sign near David & Sare leftover from project near Hyde park

closed #199774

City Construction Projects

512 E University ST

Case Date:
12/27/2024

Not sure who to contact for fiber installation issues. The workers installed a plastic access pipe in people front yard in the corner of driveway and sidewalk. Inevitably, a large truck is going to drive over it and crush it, potentially damaging the fiber. They removed the tarp with dirt, so I a now assume they are done? Would like to see this access moved farther from

open #201772

City Construction Projects

723 W Allen ST

Case Date:
3/29/2025

Entire roof being removed in historic district - concerns it is not permitted work and concerns for spread of moldy / asbestos contaminated insulation being thrown

closed #202690

City Construction Projects

1107 S Washington ST

Case Date:
5/14/2025

Gigabit workers left big utility mess —hazardous! I reported to them in February & contacted them several times but no repair—

closed #202961

City Construction Projects

2012 E Hillside DR

Case Date:
5/27/2025

The construction contractor has placed the Road Closed barricades in two of the three lanes on High St. at the Hillside intersection. This is impeding the flow of traffic and is going to cause an accident. Once three cars fill the left turn lane, High St. is effectively blocked to North/South travel. There is now only more traffic going North on High St. with the roundabout closure. Please have the barricades removed or placed to the sides of the road. If someone cannot read the road closure signage properly, they will have to pay the price once they reach the closed roundabout.

closed #202993

City Construction Projects

2012 E Hillside DR

Case Date:
5/27/2025

Since Roger Street is closed, all people who live off of high Street have to take high Street up to Morse Pike/Hillside. With these signs now up on both sides, it is down to one lane for no reason. There's no reason to have the northbound traffic on high Street blocked.

closed #173337

City Construction Projects

1005 S Covenanter DR

Case Date:
8/11/2020

The drainage easement at the south end of Greenwood Dr., where it dead ends into the sidewalk, is blocked with a landslide of debris. The water level rose to 3 feet on either side of the sidewalk and covered three properties adjacent to the clogged drain with water and debris. Thank you for your help. Jim and Debbie Quinn

closed #173347

City Construction Projects

2638 S Isabel CT

Case Date:
8/13/2020

Overgrown tree is dangerously close to our house. Its root system is damaging our driveway, is intertwined with our electrical boxes, and have roots hitting our house. We are requesting the removal of the tree and roots and the replanting of a new one. Please advise as we want to ensure that the overgrowth doesn't overlap with the winter months. There are better pictures, however, I can only upload 1 of them. Thank you.

closed #199237

City Construction Projects

822 S Fess Ave

Case Date:
11/6/2024

822 S Fess again. The gigabit people are at it again. End of driveway and into neighbor. Left a hole and trash, plastic debris and empty water bottle. Just abandoned with a hole by neighbors tree at end of drive way. Please get these people under control. So they have left this as if they started digging, changed their mind and left. Then they dug up my front yard and then on Monday, a water main rupture from their digging. ALL other installation has been down the alley WHERE the power lines run. Please respond. Issue #3.