Potholes, Other Street Repair
- Case Date:
- 7/31/2018
The Street Department has enough things to do but we would like to add something to their list. The pavement along the curb in front of our house is breaking up in good sized chunks. There are a several spots that have broken through to the dirt below. One hole is probably eight or nine inches deep and filled with muddy water. We live at 3111 East Tapps Turn. Our street is an extension west of Olcott Avenue in Hyde Park. Thanks for your help. Steve Ulrey
Potholes, Other Street Repair
1422 E Elliston DR
- Case Date:
- 8/14/2018
Greetings, I spoke briefly with a street maintenance crew as they were working in front of my home - and thought I'd share the conversation here. Over the past few years, the gutter from in front of our home (1504 E Elliston) on down to Fenway Pl has deteriorated significantly to the point that our driveway & yard are sinking as well. I'm no longer able to get my cars out of my driveway without scraping the bottom. When we get major rainstorms, I've noticed that the water runs directly into the ground from the gaps in the gutters & road, which I'd imagine contributes to the gutters & road sinking.
I appreciate that they were out there patching the holes, but the patching really is very temporary from my observation. I was wondering if the city would have any plans to shore up the foundation, perhaps rebuild the gutters in a way that my driveway/yard won't continue to sink. Your consideration would be greatly appreciated - thank you!
Potholes, Other Street Repair
4418 E Stephens DR
- Case Date:
- 8/17/2018
After all the utilities repair that's been going on in our neighborhood, our streets were completely ripped up. The city has since started patching the roads, but they've done a pretty slapdash job of it. The new paving is very uneven and there are gaps and places where it's easy to lose your footing. I've already tripped at least once in the last few days when I've been out walking my dog. I'm a young, able-bodied person so I'm sure you can see how it could pose a risk to the other residents in the neighborhood who might be older or less steady on their feet. I hope this patching effort is a temporary fix and not the final product, because that would be unacceptable. I would love to hear back about this issue and whether or not this is a temporary fix. I hope the roads in our neighborhood can be completely repaved when this water utilities project is fully completed.
Potholes, Other Street Repair
7650 Indiana 37
- Case Date:
- 8/21/2018
There are many potholes along Old State road 37 that need to be addressed before winter gets here. We really feel that the road should be paved. The road it horrible after you go past Dunn street. Also on N. Fish road there are several spots that need to be taken care of with fill from water build -up. As well as spot holes. Thank you in advance for your help. Have a great day.
Potholes, Other Street Repair
- Case Date:
- 9/20/2018
E First near the intersection with Highland.
Water valve that could use a little asphalt to smooth it out?
Utilities Construction
2610 Round Hill Ln
- Case Date:
- 7/5/2024
Could the city please finish the water project started during the winter? I scrap my car every time I come out of my driveway. The patch jobs were terrible on all parts of the Spicewood neighborhood.
Sidewalk & Curb Complaints
- Case Date:
- 7/30/2024
At 916 S. Westhill Ct., 47403, the City began to repair the area of my street, but never completed the job. There had been a water main break. There are still orange cones in the area at the bottom of my driveway.
Potholes, Other Street Repair
1021 E Maxwell LN
- Case Date:
- 8/20/2024
The blacktop around the storm water grate in front of my house has eroded.
Potholes, Other Street Repair
Spicewood Ln
- Case Date:
- 9/4/2024
The city of Bloomington utilities replace many water mains in April. Our asphalt has still not been repaired and replaced.
Potholes, Other Street Repair
Spicewood Ln
- Case Date:
- 9/4/2024
The city of Bloomington utilities replace many water mains in April. Our asphalt has still not been repaired and replaced.