uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (24)

closed #125721

City Construction Projects

Case Date:
4/13/2012

Hi, I ride my bike to work from Tamarron to North Walnut. Usually I take the bike route, including the Grimshaw Trail beside the train tracks, then cross the Bypass to Eastgate. Because of the construction on the Bypass, Eastgate is now closed, but there is no warning until you actually get there, which is very inconvenient. I also don't know how else I can get to my destination without either going all way down to 3rd, which would add about 10 minutes to my trip in each direction, or take my life into my hands by riding on 10th (I know, I know, the spandex brigade do this, but at 49 I've moved beyond the "live fast, die young, leave a good looking corpse" philosophy). What I would like to know, is how can I get to work safely if I can't go from the Grimshaw Trail over to Eastgate, and why do you not warn cyclists a little earlier (like say at Pete Ellis Drive and maybe Union Street on the other side) that Eastgate is closed so we don't waste even more time heading in that direction? Thanks, Gerry Matthews

closed #125782

City Construction Projects

500-520 S Walnut St

Case Date:
4/18/2012

Regarding construction on South Walnut Street- at the intersection with second street, motorists are trying to go north from both lanes south of second into the single lane north of second street. These lanes need to be clearly marked during construction as typically the far left lane is for left turns only. Please make it easier for people to know where to go. Thanks.

closed #129266

City Construction Projects

Case Date:
10/16/2012

i noticed a very dangerous situation that needs to be fixed. on the old part of west 3rd street that is still 2 lanes, beside the cresent donut shop, it is very narrow there, & i noticed that the edge of the street there is crumbling away. when it starts snowing in a month or 2, it will be even more dangerouse, because as the snow accumulates it can form a false shelf effect. in other words, the street there could look wider than it really is, so a driver could easily go over the edge & down into a little creek under there. please fix. thank you

closed #131167

City Construction Projects

1016 S Mitchell ST

Case Date:
4/2/2013

A new sidewalk in this area was installed, but the road doesn't seem to be finished. There are huge potholes and it is unsafe for bikes, pedestrians, and vehicles.

closed #133715

City Construction Projects

Case Date:
8/27/2013

Road construction project on South Rogers St. Particular address 2018 S. Rogers. My elderly aunt (85 yrs old) lives at the back of this driveway. For the second time this summer I have had to complain about her driveway being inaccessible. We can park on the street to visit, but because of her physical condition she cannot walk to the street to our cars. Last Wednesday concrete was poured, a family member talked to someone on the construction crew and was told it couldn't be driven on until Monday. This is Tuesday and the driveway is still inaccessable! How many days is a person expected to stay in their home because of this? I called the Public Works number earlier this summer, unfortunately I don't recall the date, but it was on a Friday and I asked to speak to the person in charge of this project, I was given Justin Wykoff's voice mail. He never returned my call. I called 339-1444 after normal work hours and they also tried to give me Justin's name but I said he never returned my call and it was urgent that we get this driveway accessible so she could leave her home. I was given the Contractor's phone number, I left a message for him, didn't receive a call back so I called him again around 8:30 that evening and he said he would get it fixed on Saturday. It was fixed by 10:30 Saturday morning. I never heard anything from Justin. I called Justin Wykoff again this afternoon and left a message, I have not received a call back. I went by there this evening at 5:30 and took pictures which I am attaching to show the current state of the driveway. We need to get her out of the house, she's elderly but that doesn't mean she should be trapped in her house. It should be a common courtesy if nothing else for Justin to return my call and at least tell me when we can get in her driveway. Would it be better if I just contact the newspaper next time and let them know that city employees and the contractors the city does business with does not care about our elderly citizens being stuck in their homes for more than 7 days because of this construction project? I'm sure there are other elderly people living in the midst of this construction but their homes may be closer to the street or they may not have someone to complain for them. I'm not sure what can be done to avoid this situation during the remainder of this construction, but I think every option should be considered beforehand for the elderly or handicapped citizens. I would like for Justin Wykoff to call me at the above number and explain to me what the delay is in gettin this driveway open and why he has not returned my calls. He could have at least followed up with me on the first complaint to make sure it was resolved.

closed #144539

City Construction Projects

Case Date:
4/9/2015

I have two trees in the parkway outside me home that two years ago was painted with red paint to remove. To date they are still there and the largest on with a strong wind will fall across the tree, and it is infested with bugs as well. Can someone please take a look at them. Thanks.

closed #153287

City Construction Projects

Case Date:
6/3/2016

The pavement at the gutter/curb/catch basin in front of my home, 1914 Hackberry Rd, has failed and there is a 12"x12" hole at the catch basin. I am surmising that the connection has failed and has washed out under the pavement. Could you have someone check it out for us. Thanks, john

closed #158659

City Construction Projects

Case Date:
4/5/2017

Mayo has installed a new post ( pole ) on my property at the corner of Brownridge and Fieldcrest in Hoosier acres. They did extensive digging around the area and were supposed to reseed, since I had my lawn completely reseeded this last fall. This has not been done and there is a muddy mess at the corner. Moreover holes were made at various places on the lawn and these were never filled in. This is a hazard in mowing or just walking on the lawn. If someone catches there foot in the hole it could result in a broken leg or twisted ankle. Mayo or the city would then be responsible. There are little flags all over the lawn, which needs to be mowed. Should I just remove these ?. Is the work completed ? On the pole there is a street lamp to replace the one currently at the corner, but neither is working, which is another hazard. The ditch in the area has also collapsed. I believe it is Zayos obligation to fix this, or someone ( the city of Bloomington ) should. Milton Taylor 3712 Brownridge Rd. 812-336-2095

closed #159806

City Construction Projects

201-251 North Lincoln Street

Case Date:
6/21/2017

Hi, There's a couple of large road cuts at the intersection of Lincoln and 6th St. If the city is not planning on filling these any time soon could we at least get the sharp edges softened? Sometimes I've seen this done and it makes road cuts much easier to drive over without damaging your tires. Thanks, Vickie Nelson Bloomington

closed #160679

City Construction Projects

1106-1112 South Graywell Drive

Case Date:
8/16/2017

Does the city have a plan for taking in, and disposing of, our old trash bins and cans? Saying that "Residents are encouraged to reuse their old trash cans as yard waste containers" seems ingenuous. How long a yard waste season goes Bloomington have? -- 6 months? Where will I store 2 35-gal. cans and a 20-gal., plus the 3 bins currently used for recycling -- since my garage will be filled up with two 64-vallon containers?