closed #66986

City Construction Projects

1204 S Grant ST

Case Date:
7/30/1997

Citizen objects that Utilities will only repave area torn up for water main installation. Says the work has damaged the whole street and it needs repaving. Says the front of her property has been damaged by storage & removal of gravel, etc. Wants her lawn repaired. Has spoken with Doug Jones who said Mike Farmer would call her. Has also spoken with Dana at Street.

closed #118910

City Construction Projects

425 E KIRKWOOD AVE

Case Date:
8/11/1997

Citizen is manager of Jiffy Treet. Says sidewalk in front of business is very bad and several older people have almost tripped. Did not realize property owner is responsible....he rents from Claire Young, 812-597-5711. JA told him we'd have Street check it out (Tom Goldman).

closed #66744

City Construction Projects

W TAPP RD

Case Date:
8/20/1997

Noticed that City has blocked off the road through the medical center/COTA which was acting as an alternate route around the Tapp Road work. State is working on 37 exits for Fullerton Pike and Rockport Road and has them down to one lane. This is creating a very dangerous situation since Rockport is the official Tapp Road detour. Someone should look at this and open the road through the medical center or see if something else can be done before someone is killed.

closed #118807

City Construction Projects

409 E Southern DR

Case Date:
8/26/1997

Ms. Costley owns the above rental property. Wants to know if the area between the street and lawn where recent work was done will be seeded and strawed. Utilities says this work was on storm sewers in conjunction with Hillside work.

closed #118795

City Construction Projects

304 S Rogers ST

Case Date:
8/28/1997

After traffic calming device was installed at the corner of 3rd and Rogers, sidewalk had to be realigned. Realigning meant tree had to be dug up and the lawn in this area was never fixed. See letter

closed #118754

City Construction Projects

401 N Morton ST

Case Date:
9/5/1997

Steve does not understand why contruction projects around campus and the kirkwood area begin exactly when the students return to school. Why don't they start in the summer when there is much less traffic?

closed #118726

City Construction Projects

S COLLEGE AVE

Case Date:
9/8/1997

Citizen says City has shown poor planning by closing off College Ave right when all the students have come back, and when 4th street is also closed for a project. Why couldn't this have been done earlier in the summer when traffic wasn't so bad? College is one of the busiest streets in town and this should have been anticipated and planned better. Note: This is FYI only, citizen did not want a response.

closed #118727

City Construction Projects

S COLLEGE AVE

Case Date:
9/8/1997

Citizen says City has shown poor planning by closing off College Ave right when all the students have come back, and when 4th street is also closed for a project. Why couldn't this have been done earlier in the summer when traffic wasn't so bad? College is one of the busiest streets in town and this should have been anticipated and planned better. Note: This is FYI only, citizen did not want a response.

closed #66506

City Construction Projects

304 N BRYAN ST

Case Date:
9/10/1997

The sewer in the alley behind 304 N. Bryan St. was dug up by private contractor. After the work was completed, the hole was improperly filled in, which has caused a sink hole.

closed #118693

City Construction Projects

S ROCKPORT RD

Case Date:
9/18/1997

Rockport between 37 and Country Club has become very hazardous during the detour. Tapp Rd construction has taken far too long for the size of the project. Its not a long section of road. why hasn't this project been finished and reopened? If there's a valid problem, city or county should monitor the traffic.