closed #167342

Sewer Problems (Storm Sewers)

1107 S Washington ST

Case Date:
2/7/2019

After the heavy rain on 2/7/19 a pipe in the alley behind 1107 S Washington St continued to push water up even after the water level in the Davis street ditch went down.

closed #167833

Sewer Problems (Storm Sewers)

1150 W Acuff Rd, Bloomington, Indiana, 47404

Case Date:
3/19/2019

We live on the corner of Acuff Road and Kinser Pike. Under the thick layer of soil and big pile of leaves lies our metal storm drain. Rain rushes and washes dirt from the farm field behind our house via the deep trench along the side of Acuff Road (obviously we have NO curbs or rain gutters), and all that debris ends up on top of our storm drain. The drain is consistently covered and therefore clogged, so all the rain water rushes right over it and flows onto Kinser Pike. We are constantly cleaning all the collected debris from the grate even though we pay for this cleaning/maintenance service on our monthly water bill. We are in desperate need of a solution to this problem.

closed #167876

Sewer Problems (Storm Sewers)

1150 W Acuff Rd, Bloomington, Indiana, 47404

Case Date:
3/25/2019

This is a follow-up to case # 167833. So the storm drain was uncovered, which is good, however, all the debris that was covering it was thrown in our yard--very much NOT appreciated!!! Now, we have to clean that up. Plus, the 4 or so inches of silt/sand/soil in front of the grate is keeping the rain water from reaching the storm sewer as seen in my photo. We received rain today, and it just collected on the road.

closed #168495

Sewer Problems (Storm Sewers)

1150 W Acuff Rd, Bloomington, Indiana, 47404

Case Date:
5/12/2019

So, in lieu of a true rain gutter, the street department filled in the deep crevice along Acuff Road with gravel, which after a couple spring rains has washed down in front of our storm drain. As it continues to rain, more gravel will wash. We need a true rain gutter, or the crevice along Acuff needs to be filled in with black top or concrete--something permanent.

closed #167748

Sewer Problems (Storm Sewers)

1200 E Hillside DR

Case Date:
3/11/2019

The storm drain at the corner of E Hillside and S Olive is clogged once again. This is due to the all of the runoff from gravel driveways south and uphill of the drain. This is a repeat problem everytime it rains. Please clear the drain and work on a longterm solution.

closed #168854

Sewer Problems (Storm Sewers)

1315 W 6th ST

Case Date:
6/10/2019

I filed a report about three weeks ago about a blocked storm drain that keeps overflowing and spilling water into our yard. It overflowed yesterday, and it's like a river of water running over the street and into our yard. The water is doing considerable damage to our side and back yard--it's basically underwater whenever it rains. This really does require some serious attention. Either a more thorough clean up or repair. It's costing us 100s if not 1000s of dollars in repairs to our yard. Please try to fix this. The storm drain is clogged on the 1300 block of W 6th Street, and our house is 1315 west 6th street.

closed #168992

Sewer Problems (Storm Sewers)

1338 E Browning CT

Case Date:
6/17/2019

Water overflowing rapidly. I am not sure what kind of sewer this is, I just assumed it is overflow from recent rain.

closed #169307

Sewer Problems (Storm Sewers)

1436 W Petal CT

Case Date:
7/7/2019

1448 W Petal Ct Bloomington, In 47403 street washed out underneath. at storm drain, deep enough to do severe damage to a vehical

closed #167757

Sewer Problems (Storm Sewers)

1515 E University ST

Case Date:
3/12/2019

Culvert/Edge of asphalt washed out. Needs stone

closed #167311

Sewer Problems (Storm Sewers)

1562-1802 S Rogers St, Bloomington, Indiana, 47403

Case Date:
2/5/2019

There are two storm pipes located just north of the IMI concrete facility on Rogers, directly across the street from the warehouse. One storm pipe appears to be mostly blocked by debris (lumber, branches, some plastic and other trash). The second pipe is mainly blocked by a large dam of branches. Water is slowly flowing over the dam and draining through the southern pipe. Yesterday, 04 Feb, the water level appeared to be approximately 6 inches above the makeshift dam.