uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (40)

open #185582

Utilities Construction

S Mill Stone Way, Bloomington, IN 47401, USA

Case Date:
9/14/2023

Gigabit or AES or their contractors are installing fiber optic cable or something such as that. Will they be repairing all the grass from the holes and tracks from the heavy equipment?

open #185872

Utilities Construction

S Mill Stone Way, Bloomington, IN 47401, USA

Case Date:
10/4/2023

Gigabit or Giga-something installed fiber optics in the neighborhood. The holes they dug in the grass were not repaired. After advising them of the situation they came out to "repair" the grass. The soil was filled with rocks and gravel. There were no grass seeds in the soil. I spent a whole day picking rocks and gravel out of the soil, buying top soil, and grassseed to fix this. The ground is no longer level and there's also rather gouges or chunks in sidewalks and curbs. The road had preexisting, but plugged pot holes near the Sare entrance, but now those potholes are open again and expanding.

closed #156774

City Construction Projects

Indiana University Bloomington

Case Date:
10/26/2016

Manhole cover removed on west side of Highland Ave. by Lambda Chi House.

closed #187079

City Performance

Gordon Pk @ Southcrest Estates, Bloomington, IN 47401, USA

Case Date:
1/31/2024

What is the City doing at Parcel No. 53-08-16-300-046.000-009? The property address is listed as 3410 S Walnut St, Bloomington, In 47403-4523. There is activity occurring on the south side of the property closer to W. Gordon Pike that involves what sounds like an excavator with a hydraulic jackhammer attachment endlessly breaking rocks. It went on for 6-10 hours Monday and Tuesday this week, and is continuing today. Is this a short term construction project with an end date, or is the City planning to do this in perpetuity for some reason?

open #182111

Utilities Construction

Bloomington, IN, USA

Case Date:
11/19/2022

It is sinking and needs cleaned.

closed #162207

Water Utility Problems

804 1/2 S Peachtree LN

Case Date:
1/2/2018

Broken water line

closed #163197

Potholes, Other Street Repair

701-715 South Mitchell Street

Case Date:
2/18/2018

I am the owner-occupier at 1604 E University St. January 8-10, a water line had frozen and was repaired under the gravel alley that leads to the driveway/parking spots at the back of my house (and 3 other residences). At the conclusion of the repair, the two large holes that had been dug to access the water line had been filled in and some new gravel was spread over them. I do not believe that enough gravel was replaced, as the alley is now incredibly uneven and there are several large low spots that make it difficult to navigate, especially in the recent icy/snowy conditions. Is it possible for the City to add some more gravel to the alley?

closed #186490

Utilities Construction

601 S Swain AVE

Case Date:
12/12/2023

I let you know there utilities road work on east 2nd street

closed #164948

City Performance

600 E Hillside DR

Case Date:
6/25/2018

I called customer service for City of Bloomington utilities. The first lady I spoke with would not take herself off speaker phone dispite the inhibiting amount of feedback. The 2nd lady I spoke with was unhelpful and did her best to transfer my call away without helping me. I would consider both of the reps behavior to be very rude.

closed #156692

Drainage or Runoff

400-404 North Sheffield Drive

Case Date:
10/20/2016

It is nice to have the sewer drains cleared. But they leave the leaves next to the drain and the next time it rains it clogs the drains immediately. It also kills the grass. All for drains at this intersection actually 6 trains at this intersection have a pile of leaves next to them. It was my understanding that those who cleared the storm drains were also supposed to take the debris with them. Please advise.