closed #103219

City Construction Projects

401 N Morton ST

Case Date:
6/10/2003

closed #107789

City Construction Projects

110 S Clark ST

Case Date:
9/19/2001

Ms. Ritter stated that a street cut was done in front of her house and that the street cut has fallen in. She thought that the cut was made to repair a gas line, but said that the City made the cut?

closed #53758

City Construction Projects

420 E Kirkwood AVE

Case Date:
6/13/2000

Mr. Koontz called T&D and said that his wife was driving on the alleys at 420 E. Kirkwood (behind McDonalds's) and did a lot of damage to her car.

closed #57792

City Construction Projects

309 N Walnut ST

Case Date:
6/16/1999

sidewalk torn up in the 300 block, in front of Taco Bell (think by gas company) and was never repaired. Has been out for awhile and is a hazard to pedestrians (Carol I also think they did not repair the sidewalk next to Alice's house on Morton and 10th. You may want to address both of these walks with them)

closed #116841

City Construction Projects

423 E Kirkwood AVE

Case Date:
7/2/1998

Mr. Madsen called to express his concern about the efficiency of tax money on the sidewalk sweeper the City just purchased. He believes the City merchants should sweep their own sidewalks, and in the winter should shovel their own walks to better promote people to use the dowtown area. This was just a general complaint to voice his concern.

closed #116842

City Construction Projects

423 E Kirkwood AVE

Case Date:
7/2/1998

Mr. Madsen called to express his concern about the efficiency of tax money on the sidewalk sweeper the City just purchased. He believes the City merchants should sweep their own sidewalks, and in the winter should shovel their own walks to better promote people to use the dowtown area. This was just a general complaint to voice his concern.

closed #66048

City Construction Projects

401 N Morton ST

Case Date:
10/23/1997

Mr. Sutherland is frustrated and perplexed, that the City has the nerve to take on so many construction projects at one time, especially when all the students are back in town. He had to detour 4 different times just to get to work on the west side of town. He thinks this is very poor planning on the part of the City, and he'd like to know how all of this construction can be scheduled to take place at the same time?

closed #118754

City Construction Projects

401 N Morton ST

Case Date:
9/5/1997

Steve does not understand why contruction projects around campus and the kirkwood area begin exactly when the students return to school. Why don't they start in the summer when there is much less traffic?

closed #67178

City Construction Projects

501 E 7th ST

Case Date:
7/14/1997

Trash, concrete, etc., left on sidewalks from remodeling and curb cut. Vehicles are parked on sidewalks.

closed #119217

City Construction Projects

2535 W Evergreen DR

Case Date:
6/12/1997

MR. LUCAS CALLED AND STATED THAT SEWER LINES WERE INSTALLED TWICE IN A YEAR (THE LAST BEING ABOUT 5 WEEKS AGO) AND THAT DAMAGE WAS DONE TO HIS PROPERTY AND HAS NOT YET BEEN REPAIRED.