Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53517957550848 39.155618114825785,-86.53479233158195 39.15561291513657)
Construction for 115 E Kirkwood Lofts 115 E Kirkwood Ave January 28, 2026 to July 28, 2027
Genesis Construction is requesting a pedestrian diversion and intermittent closures, traffic lane shifts and intermittent lane closures, alley closures, and metered parking reservations associated with the project at 115 E Kirkwood Avenue. The request impacts the northern sidewalk on E Kirkwood, the north–south and east–west alleys surrounding 115 E Kirkwood, the east–west travel lanes on E Kirkwood, and the metered parking spaces along the north and south side of E Kirkwood.
External Project
LINESTRING(-86.53245771844563 39.16705931743067,-86.53296069631311 39.16706282003534,-86.53295467260338 39.16667869420775)
W Club House Dr Closure W Club House Dr, west of N Old SR 37 May 16, 2026 to December 31, 2031
W Club House Dr east of the Sycamore Shelter and to the intersection at N Old SR 37 has been closed. The Sycamore Shelter can still be accessed from the west via Kinser Pike and Club House Dr. Monroe County has accepted ownership of the bridge but does not currently have funding for repairs as of 8/3/26. A date for re-opening will be contingent upon necessary bridge repairs and is currently not known.
Engineering
LINESTRING(-86.53707976211632 39.19811710429795,-86.53700130750263 39.19812645808193)
West 2nd Street Modernization and Safety Improvements 2nd Street between Walker Street and Morton Street June 1, 2026 to April 1, 2027
Intermittent lane restrictions and traffic switches will be implemented.
Engineering
LINESTRING(-86.54614342649008 39.161438835305034,-86.53498313659308 39.16139200980018)
West 2nd Street Modernization and Safety Improvements S Morton Street between W University St and W 2nd Street July 1, 2026 to November 11, 2026
West 2nd Street Modernization and Safety Improvements
Engineering
LINESTRING(-86.53628658086588 39.161296260559084,-86.53629629814417 39.16042602062828)
ROW2026-03-2393 1009 W Allen Street July 1, 2026 to September 11, 2026
Lane restrictions for 2 days between listed dates
Engineering
LINESTRING(-86.54432382616537 39.15558113016192,-86.54404882695962 39.154052551758724,-86.54403876867582 39.15391995661321,-86.54404547419836 39.15381206037901,-86.54410414752057 39.153678164822196,-86.54414773341706 39.153611866927946)
Rhorer Road Bridge Replacement. East Rhorer Road from South Jamie Lane to South Sare Road. July 6, 2026 to October 2, 2026
Full closure of Road Road between South Jamie Lane to South Sare Road. Detour on South Walnut Street Pike to East Winslow Road to East Rogers Road to South Sare Road.
Monroe County Highway Department
GEOMETRYCOLLECTION(LINESTRING(-86.51390771909678 39.12145622576017,-86.5135500912827 39.1214569193462),LINESTRING(-86.51354919726761 39.12145761299567,-86.51354919726761 39.1214569193462))
ROW2026-03-2391 1405 N College July 15, 2026 to March 25, 2027
LANE CLOSURE Work Site: Approx. 308 ft. north of the intersection of W. 17th St. & N. College Ave. Type of Work: replacing equipment only on existing Pole 174-150
Engineering
LINESTRING(-86.53471862482918 39.179533124853975,-86.53473531011427 39.17904001681751,-86.5347144535079 39.17952989136995)
ROW2026-04-2447 113 S Smith RD July 15, 2026 to August 31, 2026
lane closures
Engineering
LINESTRING(-86.48132271673016 39.16632563686514,-86.48125087291123 39.16632935030836,-86.48121554353493 39.164972820328785,-86.48128738735385 39.16497096357139,-86.48131612488133 39.166325946536375)
ROW2026-08-2680 1455 W Bloomfield Road August 11, 2026 to September 8, 2026
Lane closures for street cuts associated with gas line work.
Engineering
LINESTRING(-86.55757770438115 39.158068628057634,-86.55720860858987 39.15822159653399,-86.55639617360107 39.158626221222875,-86.5552294915024 39.159351579169254,-86.55526767382565 39.15928743216932,-86.55638344616015 39.15859003536977,-86.55719800238911 39.15818705529415,-86.55748012733301 39.158076852177714,-86.5575734619009 39.15806698323348)
Milling and Paving on E Miller Dr E Miller Dr from S Walnut St to the first speed hump just east of S Henderson St August 17, 2026 06:00 am to 16:00 pm September 3, 2026
Lane Restrictions on E Miller Dr from S Walnut St to the first speed hump just east of S Henderson St for milling and resurfacing.
Street
LINESTRING(-86.53258330540066 39.1468946555928,-86.53062585180277 39.14691505967471,-86.52859473059635 39.14691097885881,-86.52707402067757 39.14690689804266,-86.52693194743256 39.14691914049038,-86.52686354179608 39.14693954456513,-86.52666358685865 39.146984433508834,-86.52655308544588 39.147012999185336,-86.52614265162697 39.14702116080508,-86.52585850513695 39.14700483756468,-86.52559014456304 39.14698851432047,-86.52549542906637 39.14698035269694)
ROW2026-08-2688 134 East 7th Street August 17, 2026 to September 11, 2026
Lane closures- Short term.
Engineering
LINESTRING(-86.50773129680023 39.16821038694164,-86.50827276774513 39.16820778756244)
ROW2026-08-2696 3115 S Walnut Street August 24, 2026 to November 2, 2026
Lane closure
Engineering
LINESTRING(-86.53139870895787 39.12769739955425,-86.53140961008194 39.12672067237892)
Bloomington Convention Center 3rd Street Reconstruction 301 W 3rd St August 25, 2026 to September 18, 2026
Closure of West 3rd Street between College and Walnut for median replacement, paving, sidewalk, and curb replacement.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.5347579372061 39.16455566132365,-86.53376586388922 39.16454885433669),LINESTRING(-86.53376293741924 39.164655497056714,-86.53476671661598 39.16466230403336))
Kirkwood between Rogers and Pine: lane restrictions, flagging through this corridor. Kirkwood between Rogers and Pine August 26, 2026 to November 25, 2026
There will be lane restrictions with flagging throughout the project duration. This will be for concrete work, milling and paving, and striping. Between the dates of Oct 5th and Oct 24th, weather permitting, the intersection of Rogers and Kirkwood will be an active 4-way stop.
Engineering
LINESTRING(-86.53871888988866 39.16662737783176,-86.54842546717605 39.166689987041195)
Patterson between Grimes and 3rd St: lane restrictions, flagging through this corridor. Patterson between Grimes and 3rd St August 26, 2026 to November 25, 2026
There will be lane restrictions with flagging throughout the project duration. This will be for concrete work, milling and paving, and striping.
Engineering
LINESTRING(-86.53683370113019 39.153335691690245,-86.54181064011533 39.15394251541889,-86.54345396926207 39.155920722835276,-86.54825061004615 39.16056525193349)
Rogers St between Patterson and 1st St: lane restrictions, flagging through this corridor. Rogers St between Patterson and 1st St August 26, 2026 to November 25, 2026
There will be lane restrictions with flagging throughout the project duration. This will be for concrete work, milling and paving, and striping.
Engineering
LINESTRING(-86.53874184326119 39.15381014075365,-86.53864911379202 39.159143194572096)
Grimes between Walnut and Patterson: lane restrictions, flagging through this corridor. Grimes between Walnut and Patterson August 26, 2026 to November 25, 2026
There will be lane restrictions with flagging throughout the project duration. This will be for concrete work, milling and paving, and striping.
Engineering
LINESTRING(-86.5337353862689 39.153353907205144,-86.53684373653472 39.153348112847794)
Lane restrictions on Patterson Dr from south of 3rd St to Grimes Ln. Lane restrictions on Patterson Dr from south of 3rd St to Grimes Ln. There will be flagging for sidewalk and curb ramp installation and for milling and re-paving. August 31, 2026 to September 21, 2026
This is part of the Grimes, Kirkwood, Patterson, and Rogers Project. There will be lane restrictions on Patterson Dr from south of 3rd St to Grimes Ln. There will be flagging for sidewalk and curb ramp installation and for milling and re-paving.
Engineering
LINESTRING(-86.55182187657726 39.164185707317955,-86.54156797754104 39.15386356919683,-86.53832990370971 39.153776382533636,-86.5372055726374 39.15349738475152,-86.5340799301977 39.15330557321778)
ROW2026-05-2476 223 E 1st Street August 31, 2026 to September 4, 2026
Lane closure
Engineering
LINESTRING(-86.5316821307051 39.15937250857485,-86.53134685457823 39.15937042881018)
CBU - Stormwater Maintenance Intersection of South Fairview Street and West Fourth Street, along with a section of West Fourth Street August 31, 2026 to September 11, 2026
Beginning August 31st, City of Bloomington Utilities (CBU) will begin a phased project in the area of South Fairview Street and West Fourth Street to allow crews to complete stormwater maintenance. Phase 1: The first phase will include the closure of the intersection of South Fairview Street and West Fourth Street, along with a section of West Fourth Street extending to the alleyway west of the intersection. This phase is expected to continue through September 11.
Utilities
LINESTRING(-86.5409069002318 39.16563534589187,-86.5416850383151 39.165645703121726)
2026 Fourth Street Festival of the Arts and Crafts 4th Street between Lincoln and Indiana Grant between Kirkwood and 3rd September 4, 2026 to September 6, 2026
2026 Fourth Street Festival of the Arts and Crafts
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.53043913534032 39.16557821778457,-86.52699341191897 39.16554851507064),LINESTRING(-86.52980188236268 39.166514067068874,-86.52985550746962 39.16462675535553))
Lane Restrictions on E 3rd St for Pavement Markings E 3rd St between S Walnut St and S Indiana Ave September 8, 2026 06:00 am to 06:00 am September 10, 2026
Lane Restrictions on E 3rd St between S Walnut St and S Indiana Ave for pavement markings. This will be completed by a contractor.
Street
LINESTRING(-86.53360346959839 39.164623068369195,-86.53110540640535 39.1645999419799,-86.52982281873604 39.164582597182914,-86.52919643871152 39.164582597182914,-86.52862225702239 39.164582597182914,-86.52819511925165 39.164436238750966,-86.52786224455751 39.16433393275125,-86.52692359789742 39.164303705950175)
Eagleson Ave Bridge Replacement Intersection at N Eagleson Ave and Law Lane September 8, 2026 to September 24, 2026
Utility relocation
Indiana Department of Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.51542449379579 39.17358169585677,-86.51532960803156 39.173564181844085,-86.51538382846826 39.173420566776116,-86.51522568552792 39.17341356115551,-86.51524375900681 39.17336452179194,-86.51539738357744 39.173382035854274,-86.51544256727468 39.173259437326266,-86.51552841629943 39.17326994577991,-86.51550582445081 39.173385538666224,-86.51563233880309 39.17340305272333),LINESTRING(-86.51563233880309 39.17340305272333,-86.51561426532419 39.17345909767678,-86.51550130608109 39.1734450864426,-86.51543353053523 39.173574690252195))
Lane Restrictions on S Walnut St for Pavement Markings S Walnut St from W Grimes Ln to W 2nd St, the curve connecting S College Ave to S Walnut St, and the section of W Dodds St from S College Ave to S Walnut St September 9, 2026 06:00 am to 06:00 am September 11, 2026
Lane Restrictions on S Walnut St from W Grimes Ln to W 2nd St, the curve connecting S College Ave to S Walnut St, and the section of W Dodds St from S College Ave to S Walnut St. This will be completed by a contractor.
Street
GEOMETRYCOLLECTION(LINESTRING(-86.53373028974472 39.15337017745125,-86.53368198044622 39.15694769425539,-86.53367556871655 39.15742249746759,-86.5336741955099 39.157524186136186,-86.53365549743162 39.161319455787975),LINESTRING(-86.53485526294585 39.157641958126646,-86.53475514101059 39.15755518875821,-86.5346491295497 39.157514087441086,-86.53453722856324 39.157468419282765,-86.53443710662798 39.15745015201114,-86.53435987547881 39.1574274365953,-86.53426631038546 39.15739991698976,-86.53408962461732 39.15732684780366,-86.53393649695164 39.1572446448786,-86.53384815406757 39.157185276039655,-86.53375981118351 39.157061971367966,-86.53369502640187 39.15694780018299),LINESTRING(-86.5343487637439 39.15745471882951,-86.53370680545308 39.15742275109483))
Milling and Resurfacing on S Kennedy Dr S Kennedy Dr from E Burks Dr to E Rhorer Rd September 10, 2026 06:00 am to 16:00 pm September 24, 2026
Lane Restrictions and No Parking on S Kennedy Dr from E Burks Dr to E Rhorer Rd for milling and resurfacing.
Street
LINESTRING(-86.52802762495278 39.12580206579102,-86.52823982105016 39.12566784215548,-86.52834755137653 39.1255741387111,-86.52846181081357 39.12541205678332,-86.52851077914374 39.125298092704526,-86.52851730825442 39.125194258605546,-86.52849772092236 39.12446741562701,-86.52849772092232 39.12350250099192,-86.52850751458838 39.12296928849625,-86.52850425003305 39.122094262554725,-86.5285075145884 39.12147376000405)
Milling and Resurfacing on E Kennedy Ct E Kennedy Ct from S Kennedy Dr to the Cul-De-Sac September 10, 2026 06:00 am to 16:00 pm September 24, 2026
Lane Restrictions and No Parking on E Kennedy Ct from S Kennedy Dr to the cul-de-sac for milling and resurfacing.
Street
LINESTRING(-86.52851245036472 39.123641951437946,-86.52933919879443 39.12364663304322)
CBU - Stormwater Maintenance A portion of North Monroe Street south of the intersection of North Monroe Street and 17th Street September 10, 2026 18:00 pm to 06:00 am September 11, 2026
Beginning at 6:00 p.m. on Thursday, September 10, City of Bloomington Utilities (CBU) will close a portion of North Monroe Street south of the intersection of North Monroe Street and 17th Street to allow crews to complete utility work in the area. To accommodate school traffic in the area and minimize disruptions, crews will complete the project overnight from 6:00 p.m. to 6:00 a.m. Thursday and Friday nights. Motorists should use alternate routes and are encouraged to use caution while traveling near the work zone. CBU staff will work to minimize disruptions and maintain access to nearby homes and businesses whenever possible. As with all construction activities, the schedule is subject to change based on weather and field conditions.
Utilities
LINESTRING(-86.54710176326554 39.17870554322403,-86.54710176326554 39.1783929334884)
Milling and Resurfacing on E Willow Ct E Willow Ct from S Kennedy Dr to the Dead End September 10, 2026 06:00 am to 16:00 pm September 24, 2026
Lane Restrictions and No Parking on E Willow Ct from S Kennedy Dr to the Dead End for milling and resurfacing.
Street
LINESTRING(-86.52851958117762 39.12503047609698,-86.52943375925072 39.12504420240535)
Milling and Resurfacing on E Burks Dr E Burks Dr from S Walnut St to S Walnut Street Pike September 10, 2026 06:00 am to 16:00 pm September 24, 2026
Lane Restrictions and No Parking on E Burks Dr from S Walnut St to S Walnut Street Pike for milling and resurfacing.
Street
LINESTRING(-86.5313342413561 39.1266892063247,-86.531249841952 39.12667283805965,-86.52975175252922 39.1266646539257,-86.52921370632808 39.1266646539257,-86.52909765714745 39.12666056185839,-86.52895523315301 39.12664010151818,-86.52875478456828 39.126545983876696,-86.52833278754778 39.12614905157022,-86.52807958933549 39.125891248977155,-86.52800046489413 39.12580531456976,-86.52784221601145 39.125682550948795,-86.52771034194255 39.1256170769301,-86.52758901779914 39.12557206350695,-86.52738856921442 39.125563879245135,-86.5267502987209 39.125580247767886)
Milling and Resurfacing on S Burks Ct S Burks Ct from Dead End to Dead End September 10, 2026 06:00 am to 16:00 pm September 24, 2026
Lane Restrictions and No Parking on S Burks Ct from Dead End to Dead End for milling and resurfacing.
Street
LINESTRING(-86.52740339387977 39.12594511879834,-86.52735289802405 39.124327827232975)
ROW2026-08-2715 400 N Jefferson Street September 11, 2026 to September 12, 2026
possible lane closure for gas line work
Engineering
LINESTRING(-86.50608636199786 39.16991580969906,-86.50608090346932 39.16953493082869)
ROW2026-09-2722 102 South Clark Street September 11, 2026 to November 30, 2026
alley improvements
Engineering
LINESTRING(-86.5053187808586 39.166797797806396,-86.50532098828194 39.166640350008095)
CBU - Stormwater Maintenance A portion of North Monroe Street south of the intersection of North Monroe Street and 17th Street. September 11, 2026 18:00 pm to 06:00 am September 12, 2026
Beginning at 6:00 p.m. on Thursday, September 10, City of Bloomington Utilities (CBU) will close a portion of North Monroe Street south of the intersection of North Monroe Street and 17th Street to allow crews to complete utility work in the area. To accommodate school traffic in the area and minimize disruptions, crews will complete the project overnight from 6:00 p.m. to 6:00 a.m. Thursday and Friday nights. Motorists should use alternate routes and are encouraged to use caution while traveling near the work zone. CBU staff will work to minimize disruptions and maintain access to nearby homes and businesses whenever possible. As with all construction activities, the schedule is subject to change based on weather and field conditions.
Utilities
LINESTRING(-86.547108491666 39.178696109611764,-86.54711113379355 39.1784749119856)
Northbound Lane Closure at Bus Stop Northbound eastern lane of College Mall Rd just north of Buick Cadillac Dr. Eastern sidewalk also closed with detour to west sidewalk between Buick Cadillac intersection and Second St. September 14, 2026 to September 16, 2026
CGR Services will be demo-ing and reforming concrete impacting the sidewalk and bus stop. The work is expected to require a 48 hr closure window beginning Monday through Tuesday. Both the lane and sidewalk closures are expected to be reopened on Wednesday
Engineering
LINESTRING(-86.49776914620078 39.15828864904233,-86.49774710541067 39.15870736404517)
CBU - Stormwater Maintenance Intersection of South Maple Street and West Fourth Street, along with a section of West Fourth Street extending east from South Maple Street to the alleyway. September 14, 2026 to September 25, 2026
Beginning August 31st, City of Bloomington Utilities (CBU) will begin a phased project in the area of South Fairview Street and West Fourth Street to allow crews to complete stormwater maintenance. Phase 2: The second phase will include the closure of the intersection of South Maple Street and West Fourth Street, along with a section of West Fourth Street extending east from South Maple Street to the alleyway. This phase is projected to begin September 14th at 7:00 a.m. and is expected to continue through September 25th.
Utilities
LINESTRING(-86.54228299150671 39.16565046765817,-86.54163568525371 39.165645905188995)
ROW2026-09-2727 Lane closure near 910 N College Avenue September 15, 2026
ROW2026-09-2727
Engineering
LINESTRING(-86.53474637421627 39.17548511479913,-86.53475976789845 39.1751493953461)
CBU - Sanitary Sewer Maintenance Alleyway intersection at North Lincoln Street. September 16, 2026
Beginning at 7:00 a.m. on Wednesday, September 9, City of Bloomington Utilities (CBU) will begin a sanitary sewer main replacement project in the alleyway between North Washington Street and North Lincoln Street. The project is expected to take approximately one week to complete. Most of the work will take place in the alleyway, with the intersection at North Lincoln Street scheduled to close on the final day of the project. Residents in the area should watch for construction equipment and crews working near the project site and use caution when traveling around the work area. Residents whose parking is disrupted as part of the work will be provided with temporary parking permits on Tuesday, September 8. As with all construction activities, the schedule is subject to change based on weather and field conditions.
Utilities
POINT(-86.5309806958041 39.17733015872244)
ROW2026-07-2633 803 S Madison Street September 16, 2026
Temp road closure- detour to Rogers
Engineering
LINESTRING(-86.5363054909716 39.159335213990545,-86.53631628635291 39.15748108800241)
Lane Restriction for Pole Placement Bloomfield Rd. West bound lane of Bloomfield Rd just east of the intersection with S Weimer Rd September 16, 2026
One day lane closure for removal and replacement of pole for ATT. Turn lane will be utilized for lane shift.
Engineering
LINESTRING(-86.56432541629154 39.15427887721577,-86.56419480209851 39.15436542953455)
CBU - Emergency Water Utility Maintenance South Rogers Street will be closed to through traffic between West Dodds Street and West Allen Street during the work. September 17, 2026
Beginning Thursday, September 17, 2026, at 9:00 a.m., City of Bloomington Utilities (CBU) will complete emergency utility maintenance on South Rogers Street. The project is expected to be completed in one day and will require the closure of a section of South Rogers Street. South Rogers Street will be closed to through traffic between West Dodds Street and West Allen Street during the work. Motorists and residents should use alternate routes and are encouraged to use caution while traveling near the work zone. CBU staff will work to minimize disruptions and maintain access to nearby homes and businesses throughout the project. As with all construction activities, the schedule is subject to change based on weather and field conditions.
Utilities
LINESTRING(-86.53866394760514 39.15747746358721,-86.5387314168376 39.155614388696534)
CBU - Service line maintenance South Olive Street will be closed to through traffic between East Hillside Drive and East Thornton Drive September 17, 2026
Beginning Thursday, September 17, 2026, at 9:00 a.m., City of Bloomington Utilities (CBU) will complete emergency utility maintenance on South Rogers Street. The project is expected to be completed in one day and will require the closure of a section of South Olive Street. South Olive Street will be closed to through traffic between East Hillside Drive and East Thornton Drive during the work. Motorists and residents should use alternate routes and are encouraged to use caution while traveling near the work zone. CBU staff will work to minimize disruptions and maintain access to nearby homes and businesses throughout the project. As with all construction activities, the schedule is subject to change based on weather and field conditions.
Utilities
LINESTRING(-86.51880016995558 39.1505022887965,-86.518814761119 39.149478246302095)
Fiber Boring near Walnut and Winslow Intersection North bound lane of S Walnut, south of Winslow. West bound lane of Winslow at intersection. September 17, 2026 to September 18, 2026
AT&T boring south under Winslow on the east side of Walnut to the pole location just south of the Marathon.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53085657049357 39.13597246667538,-86.53104897429013 39.135969568891824,-86.53109179445148 39.13578572403466,-86.53119738171388 39.13533239171659),LINESTRING(-86.53118927113954 39.13533239171659,-86.53122171323065 39.135338682742855,-86.53111898025156 39.13578953357501))
ROW2026-08-2704 S Banta between Ralston and Country Club September 18, 2026 to November 27, 2026
Lane restrictions
Engineering
GEOMETRYCOLLECTION(GEOMETRYCOLLECTION(GEOMETRYCOLLECTION(LINESTRING(-86.5447746995723 39.13850685470166,-86.54476818194182 39.136297608116735),LINESTRING(-86.5441238198063 39.136275983024746,-86.54411266011527 39.13659048048555,-86.54402338333638 39.13668569500413,-86.54394898597903 39.136703006668114,-86.54387830835216 39.136677039073675,-86.54388574831266 39.13625001546649,-86.54387458862166 39.13695114082569)),LINESTRING(-86.54084658864161 39.13981643190684,-86.54077242692142 39.13845805311453)),LINESTRING(-86.54086666227509 39.14039829889762,-86.54085065006508 39.139897399751106),LINESTRING(-86.54217431075038 39.14127175924975,-86.54203020261927 39.139922237771685),LINESTRING(-86.54328981417132 39.14131315521354,-86.54327380225448 39.14085365875334,-86.54322576621078 39.14058872250348,-86.54317773016707 39.13994293632396),LINESTRING(-86.53997784166545 39.14122036193632,-86.53983234945547 39.139856423779236))
Eagleson Ave Bridge Replacement Bridge on N Eagleson Ave at Law Lane September 18, 2026 to June 1, 2027
Bridge replacement.
Monroe County Highway Department
LINESTRING(-86.51546650649244 39.17336681187555,-86.51560040404867 39.17292161307793)
ROW2026-09-2745 718 N Indiana Avenue September 18, 2026
Lane closure with flaggers
Engineering
LINESTRING(-86.5269550170356 39.17339374390329,-86.52694038684926 39.17301662444055,-86.52697330489131 39.173049705173895,-86.52698061998447 39.17337862136998,-86.5269550170356 39.17339468905948)
2026 Witch Fest 6th between College and Walnut September 19, 2026
2026 Witch Fest
Public Works
LINESTRING(-86.53481048758431 39.16757506315474,-86.53368127424257 39.16756619696881)
ROW2026-09-2728 1827 S Maxwell September 21, 2026 to September 23, 2026
Lane restrictions
Engineering
LINESTRING(-86.51505322577529 39.146246903352534,-86.5150568833628 39.14585640092906)
S Basswood Drive - Sidewalk Maintenance. S Basswood Drive from S Copper Beech Way to S Copper Beech Way. September 21, 2026 to September 24, 2026
Sidewalk & Curb Ramp Repair - Portion of sidewalk may be temporarily closed or restricted. Please use posted detours and follow safety signage. Also, lane restrictions will be in effect. Flaggers will be present to direct traffic.
Street
LINESTRING(-86.57109283881236 39.15666481125703,-86.57117175914723 39.15643022394784,-86.57129452411256 39.15625003316467,-86.57161020545198 39.15604604304198,-86.57202234497844 39.15578425485134,-86.57215826333291 39.15561426199821,-86.57224595259385 39.155485067155155,-86.5722678749091 39.155338872704505)
CBU - Stormwater Maintenance Portion of South Smith Road just south of East Moores Pike September 24, 2026 19:00 pm to 07:00 am September 25, 2026
Beginning at 7:00 p.m. on Thursday, September 24, City of Bloomington Utilities (CBU) will close a portion of South Smith Road just south of East Moores Pike while crews replace a stormwater culvert. The closure will be in place overnight from 7:00 p.m. to 7:00 a.m. Motorists should use alternate routes and are encouraged to use caution while traveling near the work zone. CBU staff will work to minimize disruptions and maintain access to nearby homes and businesses whenever possible. As with all construction activities, the schedule is subject to change based on weather and field conditions.
Utilities
LINESTRING(-86.48043331875505 39.149981509674376,-86.48041740254864 39.149331444451036)
College Ave Lane and Sidewalk Closure North of Square Eastern Most Southbound Lane and east Sidewalk of N College Ave between 6th and 7th St. September 24, 2026
Short term (Aprx 3 hr) closure for crane and placement of new HVAC equipment on the rood of the Wicks Bldg at 116 W 6th St
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53484052283632 39.16800978454404,-86.53484267773268 39.16767564160247),LINESTRING(-86.53474570591564 39.16800310167528,-86.53474570591564 39.167692348787256))
CBU - Stormwater Maintenance South Rogers Street from West Dodds Street to West Wylie Street September 24, 2026 08:00 am to 14:00 pm
Beginning at 8:00 a.m. on Thursday, September 24, City of Bloomington Utilities (CBU) will close a section of South Rogers Street from West Dodds Street to West Wylie Street while crews complete stormwater maintenance. The closure will be in effect from 8:00 a.m. to 2:00 p.m. Motorists should use alternate routes and are encouraged to use caution while traveling near the work zone. CBU staff will work to minimize disruptions and maintain access to nearby homes and businesses whenever possible. As with all construction activities, the schedule is subject to change based on weather and field conditions.
Utilities
LINESTRING(-86.53867641671465 39.158302550997945,-86.53868144114548 39.15751945766809)
Eagleson Ave Bridge Replacement N Eagleson Ave between Law Lane and E 10th Street September 24, 2026 to November 1, 2027
Bridge replacement
Indiana Department of Transportation
LINESTRING(-86.51546629646931 39.17336703341775,-86.51561227214475 39.17286274839222)
2026 Trades District Block Party Madison b/t 10th and 11th Maker Way b/t Rogers and Madison September 26, 2026
2026 Trades District Block Party
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.53732295095342 39.17323406942961,-86.53730109768077 39.172255345765336,-86.53727933165756 39.171280516126245),LINESTRING(-86.53854401051996 39.1722652847958,-86.5372889840463 39.17225550832464))
CBU - Water main maintenance Southbound lane of North Curry Pike in front of the SpartanNash Distribution Center. September 26, 2026 07:00 am to 17:00 pm
Beginning Saturday, September 26, 2026, at 7:00 a.m., City of Bloomington Utilities (CBU) will conduct water maintenance work along North Curry Pike in front of the SpartanNash Distribution Center. To allow crews to safely complete the work, the southbound lane and sidewalk of North Curry Pike will be restricted during the project. The lane restriction is expected to remain in place during daytime hours while crews complete the work. Motorists should use caution when traveling through the area and are encouraged to seek an alternate route if possible. CBU staff will work to minimize traffic disruptions and maintain access to nearby homes and businesses throughout the project. As with all construction and maintenance activities, the schedule is subject to change based on weather and field conditions.
Utilities
LINESTRING(-86.58309037415793 39.17539984546735,-86.58301211763022 39.17313091185724)
Lane Restrictions on S Walnut St for a Paver Patch S Walnut St from W Country Club Dr to W Gordon Pike September 28, 2026 06:00 am to 16:00 pm October 1, 2026
Lane Restrictions on S Walnut St from W Country Club Dr to W Gordon Pike for paving.
Street
LINESTRING(-86.53113566443574 39.1359252487878,-86.5314083639414 39.134799040867335,-86.5314231044552 39.134341692406736,-86.53143784496902 39.13321545915886,-86.53142310445527 39.13110015005901,-86.53138625317074 39.12867032471195,-86.53137888291381 39.126640641635674,-86.53137888291381 39.12530845165509,-86.5313715126569 39.12333013163368,-86.53137074615186 39.12148962659603)
Lane Restrictions and No Parking on S Muller PKWY S Muller PKWY from W 3rd St to the End of City Maintenance September 28, 2026 06:00 am to 16:00 pm October 1, 2026
Milling and Resurfacing on S Muller PKWY from E 3rd St to the End of City Maintenance
Street
LINESTRING(-86.5627347672702 39.164382525391176,-86.56277689904742 39.16431019275362,-86.56285213436385 39.16423552672717,-86.56289426614104 39.16420519363126,-86.56304172736127 39.16413519412933,-86.56339683805486 39.16400919485022,-86.56387232525472 39.16384119546038,-86.56440800070776 39.163647528999206,-86.56451333015077 39.163591528959216,-86.56461865959378 39.163519195508314,-86.56469020320996 39.16346585797453,-86.56499926351097 39.163362018629044,-86.5650713775812 39.16333406185598)
ROW2026-09-2761 402 E 19th September 28, 2026 to October 2, 2026
Lane restrictions
Engineering
LINESTRING(-86.52945138454076 39.18100929931484,-86.52963338668984 39.18101396313071,-86.52963489078476 39.18090902776612)
ROW2026-09-2792 344 South Rogers September 28, 2026 to September 29, 2026
Full road closure for sewer work- Detour East at 2nd and 3rd to College or Walnut.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53871399234667 39.16316483848806,-86.53864458291915 39.16317060453622,-86.53864234203925 39.163295121949886,-86.5386418995754 39.16331970800388,-86.53864086452873 39.1633772216274,-86.53871647124589 39.1633772216274,-86.53871771065387 39.16316387751226),LINESTRING(-86.53863643322866 39.16331964886399,-86.53833529428513 39.163318703572344,-86.53833407514385 39.16329507121367,-86.53863765245178 39.16329507121367))
Lane Restrictions and No Parking on S Basswood Dr S Basswood Dr from W Bloomfield Rd to the Dead End September 28, 2026 06:00 am to 16:00 pm October 15, 2026
Milling and Resurfacing on S Basswood Dr from W Bloomfield Rd to the Dead End
Street
LINESTRING(-86.56899602166523 39.14983985856239,-86.56915701054706 39.14995889812553,-86.56928217071071 39.150006044597774,-86.56939074460773 39.149997334398506,-86.56948434279485 39.14997120379422,-86.5697314420088 39.149881198305195,-86.56992238231052 39.149828937000706,-86.5701395301046 39.14981441996477,-86.57036042182618 39.14984926084597,-86.570521410708 39.14992184595965,-86.57080220526932 39.15015702121386,-86.57132854583824 39.150628218804485,-86.57185269568599 39.15109566045152,-86.57202866027778 39.15125534477471,-86.57223083236188 39.15150503226289,-86.57227950341918 39.15156890566408,-86.57236935767881 39.15177213882768,-86.57245921193844 39.152016017849206,-86.57250413906824 39.15214086035459,-86.57250595562098 39.153959353679994,-86.57250973300363 39.15473851107754,-86.57242663058503 39.15493476364827,-86.57230812873034 39.15513171299125,-86.57229301919968 39.15525473636734,-86.57226657752105 39.155409979844535,-86.57221362225494 39.155559643556614,-86.57208896862704 39.155723673679375,-86.57200586620844 39.155802759494804,-86.57193787332051 39.15584962512125,-86.57180188754462 39.155934568989636,-86.57161301841147 39.15604294550039,-86.5714017534326 39.15617747546858,-86.57125443550873 39.156318071505524,-86.57117133309013 39.156444021883374,-86.57114111402883 39.15652896503417,-86.57110711758484 39.156687134765775,-86.57109956281955 39.15680359782354,-86.57114111402885 39.156947121664416,-86.57119022000347 39.15707599996594,-86.5712393259781 39.15721073611962,-86.57124688074342 39.15735425912999,-86.57124310336077 39.157483136685755,-86.57122043906477 39.15759736886733,-86.5711600009421 39.157726245977756,-86.57108445328885 39.157852193834884,-86.57101268301824 39.157975212454375,-86.57086914247702 39.158101159865794,-86.57071804717052 39.15819195902256,-86.57055561971598 39.15827690006313,-86.57027987078155 39.15832962203669,-86.56982536372796 39.158341935344225,-86.56871481322493 39.158341935344225,-86.56839373569855 39.158344864341075,-86.5681444284427 39.15842394721028,-86.56792534024822 39.15857918369497,-86.56765336869648 39.15877542555333,-86.56753429120486 39.15885785533911,-86.56664282889632 39.15930598715488)
Road Closure - S Olive St. 812 339 1444 September 29, 2026 07:56 am to 12:00 pm
Please be advised that CBU crews have closed S Olive St. between Thornton and Hillside Dr. due to Water Line Repair. Normal traffic flow is expected to resume at 12 PM. Road signs are in place. Please contact the Utilities office at 812-339-1444 with any questions.
Utilities
LINESTRING(-86.51880368604418 39.15051442637241,-86.5188065730318 39.1494643687104)