6/17/2026 11:28:37 Closed by Cheyenne Bowlen
S High St between E Winslow Rd and E Arden is scheduled to be surfaced this summer.
Other: The east lane of High Street between the traffic circle and Arden Drive is really rough. I am glad the potholes have been filled, but it needs to be repaved.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 1 days have already passed.
S High St between E Winslow Rd and E Arden is scheduled to be surfaced this summer.
| City | Bloomington |
|---|---|
| State | IN |
| Latitude | 39.151073455811 |
| Longitude | -86.508430480957 |