City Construction Projects
201 N Morton ST
- Case Date:
- 5/20/2026
I understand you are actively working to pave this street, but these loose asphalt ramps are not accessible. Very hard to use with a wheelchair, it's like trying to wheel through beach sand. No signage directing pedestrians to a different accessible crossing area
City Construction Projects
350 W 7th ST
- Case Date:
- 5/20/2026
I understand you are actively working to pave this street, but these loose asphalt ramps are not accessible. Very hard to use with a wheelchair, it's like trying to wheel through beach sand. No signage directing pedestrians to a different accessible crossing area
City Construction Projects
2nd St & Walker St
- Case Date:
- 5/19/2026
Why are the street cuts so poorly done and do called repaired 2nd street. Done are not bad and others are terrible. I understand that a new road is supposed to going in, but our cars are getting beat up.
Also since when does the city allow patching concrete sidewalks with asphalt? I assume all that is coming out to be replaced with concrete again. I assume we’re having lovely bike lanes incorporated into this new construction project that very few people will use. Thank you for using our tax money to a fullest extent of your dreams.
City Construction Projects
936 W 2nd St
- Case Date:
- 5/7/2026
2nd St is trashed from S Walker Street to Buildings Trade Park. Recent construction did a terrible job patching their work, it’s hazardous in many places.
City Construction Projects
1205 1/2 S Rogers ST
- Case Date:
- 10/7/2025
Someone needs to check on the construction crew working Rogers Street in the Patterson area. They are blocking the sidewalk with their materials on the east side near the warehouse. One of the contractors unexpectedly pulled his truck out onto the street to block a vehicle and then pulled it out aggressively again almost causing an accident. When confronted about this being unsafe he said “I can do whatever I want“.