City Construction Projects
2nd St & Walker St
- Case Date:
- 5/19/2026
Why are the street cuts so poorly done and do called repaired 2nd street. Done are not bad and others are terrible. I understand that a new road is supposed to going in, but our cars are getting beat up.
Also since when does the city allow patching concrete sidewalks with asphalt? I assume all that is coming out to be replaced with concrete again. I assume we’re having lovely bike lanes incorporated into this new construction project that very few people will use. Thank you for using our tax money to a fullest extent of your dreams.
City Construction Projects
936 W 2nd St
- Case Date:
- 5/7/2026
2nd St is trashed from S Walker Street to Buildings Trade Park. Recent construction did a terrible job patching their work, it’s hazardous in many places.
City Construction Projects
1701 E Greenbriar LN
- Case Date:
- 5/5/2026
As a result of AT&Ts recent fiber optics installation, there are two large sink wholes next to the sidewalk between my address and my neighbors house. I called Austin Voorheis who did the installation for AT&T, but he has not come to fill in the openings. Photo's attached. This is really dangerous.
City Construction Projects
335 S College AVE
- Case Date:
- 4/20/2026
Construction crews for the convention center are regularly blocking the drive to 335 S. College.
City Construction Projects
Walnut Pike and Heather Dr. Peppergrass entrance
- Case Date:
- 4/6/2026
Previous city project. Soil washing away under sidewalk
City Construction Projects
320 W 8th St #113
- Case Date:
- 4/3/2026
Soil washing away under side walk. I have reported this area before and it seems to be getting worse. Is there a plan?Thank you for your time. Kaye Beavers, Peppergrass landscape director
City Construction Projects
- Case Date:
- 3/5/2026
Recently we have had sewer problems at 1901 S. Rogers Street Bloomington. Upon digging up the main line we found what appears to be a fiber optic line that severed our main sewer line when contractors were working recently. Could we please find out the contractors that had ROW or who to contact. We are a no profit agency and do not have the budget for this costly repair.
Thank you.
City Construction Projects
250 S Washington ST
- Case Date:
- 1/7/2026
The placement of this sign narrows the sidewalk way down here between the utility box and the street lamp pole. The narrowing in proximity to the handicapped ramp should be of concern.
thanks!
City Construction Projects
2nd and rogers
- Case Date:
- 11/20/2025
When paving projects done by old hospital
City Construction Projects
928 N Lindbergh DR
- Case Date:
- 11/15/2025
The new bicycle storage cubes are not benefiting residents and are creating two significant problems:
Immediate Safety Hazard: The cubes are an attractive nuisance and severe fall risk to children. Preschoolers have been observed climbing and jumping on the units. This confirms the greater community need is a safe play area, not this storage solution.
Unauthorized Misuse: The units are already being used as personal storage by non-residents (unhoused), leading to increased and unwelcome traffic into the residential courtyard.
The project failed to consult residents on community needs. I request immediate action to address the safety hazard and restrict unauthorized access to these units.