City Construction Projects
1205 1/2 S Rogers ST
- Case Date:
- 10/7/2025
Someone needs to check on the construction crew working Rogers Street in the Patterson area. They are blocking the sidewalk with their materials on the east side near the warehouse. One of the contractors unexpectedly pulled his truck out onto the street to block a vehicle and then pulled it out aggressively again almost causing an accident. When confronted about this being unsafe he said “I can do whatever I want“.
City Construction Projects
902 S Sheridan Dr
- Case Date:
- 8/7/2026
Abandoned detour sign lying in grass on SW corner of E Maxwell and S Sheridan. Leftover from drainage project @ E First and S Mitchell
City Construction Projects
111 E 6th ST
- Case Date:
- 6/11/2026
There is construction happening in the alleyway of 111 E 6th St, which is behind the Btown Smoke Time (corner of walnut and sixth). My apartment is in this alleyway, and there is no other access besides the alley door. The construction is currently blocking me from entering my apartment, and is blocking my roommate from leaving the apartment, because they have torn the alley out and blocked any alley entrance with heavy machinery. While I’m sure this was a necessary project, this is something that needs to be informed to residents if they are going to be blocking them inside/outside of their homes.
City Construction Projects
335 S College AVE
- Case Date:
- 6/10/2026
Construction crew blocking the sidewalk. No flagger. Pedestrians forced into Street. Thank you.
City Construction Projects
3230 S Walnut ST
- Case Date:
- 6/8/2026
Sidewalk at the ongoing construction at new Bloomington Fire Operations Center is blocked with no alternate accessible path for pedestrians. Wheelchair user had to use the vehicle driving lane on busy road in order to get around the blocked sidewalk, because the shoulder of the road was also obstructed by cones and tape.
City Construction Projects
806 W 2nd St
- Case Date:
- 6/22/2026
Following up on case #210922. The plate is still here and now has profanity spraypainted on it.
City Construction Projects
- Case Date:
- 3/5/2026
Recently we have had sewer problems at 1901 S. Rogers Street Bloomington. Upon digging up the main line we found what appears to be a fiber optic line that severed our main sewer line when contractors were working recently. Could we please find out the contractors that had ROW or who to contact. We are a no profit agency and do not have the budget for this costly repair.
Thank you.
City Construction Projects
320 W 8th St #113
- Case Date:
- 4/3/2026
Soil washing away under side walk. I have reported this area before and it seems to be getting worse. Is there a plan?Thank you for your time. Kaye Beavers, Peppergrass landscape director
City Construction Projects
Walnut Pike and Heather Dr. Peppergrass entrance
- Case Date:
- 4/6/2026
Previous city project. Soil washing away under sidewalk
City Construction Projects
2nd and rogers
- Case Date:
- 11/20/2025
When paving projects done by old hospital