City Construction Projects
2016 S Rogers ST
- Case Date:
- 9/15/2026
There are two hazard flashing signs in the 2000-2600 blocks of South Rogers Street, one by Rockport and one by Country Club. There does not appear to be any work happening in the area, so what are the signs for, and when will they go away? They’ve been here for three weeks. They do not contain information. They are just large flashing light signs that are on the sidewalk and blocking the way. Please determine who they belong to and get rid of them if possible. Thank you.
City Construction Projects
335 S College AVE
- Case Date:
- 9/11/2026
Two large rigs parked on either side of South College by the convention center construction. Leaving only one usable lane. Not safe.
City Construction Projects
811 W 2nd ST
- Case Date:
- 8/30/2026
The live east bound travel lane is undermined. Several feet of open inadequately protected trench. Not enough room to list everything in this format.
City Construction Projects
902 S Sheridan Dr
- Case Date:
- 8/7/2026
Abandoned detour sign lying in grass on SW corner of E Maxwell and S Sheridan. Leftover from drainage project @ E First and S Mitchell
City Construction Projects
806 W 2nd St
- Case Date:
- 6/22/2026
Following up on case #210922. The plate is still here and now has profanity spraypainted on it.
City Construction Projects
111 E 6th ST
- Case Date:
- 6/11/2026
There is construction happening in the alleyway of 111 E 6th St, which is behind the Btown Smoke Time (corner of walnut and sixth). My apartment is in this alleyway, and there is no other access besides the alley door. The construction is currently blocking me from entering my apartment, and is blocking my roommate from leaving the apartment, because they have torn the alley out and blocked any alley entrance with heavy machinery. While I’m sure this was a necessary project, this is something that needs to be informed to residents if they are going to be blocking them inside/outside of their homes.
City Construction Projects
335 S College AVE
- Case Date:
- 6/10/2026
Construction crew blocking the sidewalk. No flagger. Pedestrians forced into Street. Thank you.
City Construction Projects
3230 S Walnut ST
- Case Date:
- 6/8/2026
Sidewalk at the ongoing construction at new Bloomington Fire Operations Center is blocked with no alternate accessible path for pedestrians. Wheelchair user had to use the vehicle driving lane on busy road in order to get around the blocked sidewalk, because the shoulder of the road was also obstructed by cones and tape.
City Construction Projects
- Case Date:
- 5/21/2026
I appreciate the paving happening and the difficulty in controlling traffic around it downtown, but the crews need more signs and flaggers ASAP
City Construction Projects
201 N Morton ST
- Case Date:
- 5/20/2026
I understand you are actively working to pave this street, but these loose asphalt ramps are not accessible. Very hard to use with a wheelchair, it's like trying to wheel through beach sand. No signage directing pedestrians to a different accessible crossing area