City Construction Projects
3625 E Morningside DR
- Case Date:
- 2/26/2019
the western end of Morningside Drive--west of Smith Road--has long been unsafe because there are no sidewalks. There are several families with young children, many residents walking dogs and walking to the park, and sidewalks would greatly improve general safety. thanks.
City Construction Projects
3744-3812 E 10th St, Bloomington, Indiana, 47408
- Case Date:
- 6/3/2019
The drilling contractors on 10th Street near Barrington Place and Woodbridge Apartments appears to have left potentially hazardous items on the ground. At the very least, these items constitute unsightly and unwanted litter. At worst, the items could be leaking in an area that ultimately drains to Griffy Lake via a nearby stream located downslope.
City Construction Projects
3751 W Tapp RD
- Case Date:
- 8/7/1996
Mr. Hoover called to complain about the recent construction on Tapp Road. He believes the construction caused his driveway to crack. I referred Mr. Hoover to Risk Management Department.
City Construction Projects
3812 S Laura WAY
- Case Date:
- 5/23/2020
S Laura Way is on a signed, much used bicycle route. Going north from S Jamie Ln it goes downhill for 0.2 miles. A bicycle going down this hill will reach a high speed at the bottom where there is a deep pothole. This road hazard could easily damage a bicycle or flip it over. It is located at 3813 S Laura Way. This pothole should be repaired.
City Construction Projects
3950 W Tapp RD
- Case Date:
- 1/21/1997
MS. BRIDGES CALLED TO COMPLAIN THAT WHEN NEW WATER LINE WAS PUT IN TAPP RD. WAS TORN UP AND WAS ONLY PATCHED, NOT REPAVED. SHE CALLED UTILITIES AND WAS INFORMED THAT ROAD WOULD BE REPAVED BY CONTRACTOR IN DECEMBER. ROAD HAS NOT BEEN REPAVED AS OF TODAY.
City Construction Projects
401 N Morton ST
- Case Date:
- 8/12/1996
Says promised traffic calming devices have not been installed. Were told they'd go in right away (6th St). Says City Landscaper told him no one discussed watering of greenery with him. Says City departments aren't coordinating and work isn't getting done.
City Construction Projects
401 N Morton ST
- Case Date:
- 8/9/1996
Sidewalk on Maple from 5th to 6th was recently replaced. While it needed to be replaced, this was a historic sidewalk as are many on the west side. Policy should be developed to preserve historic sidewalks in original condition when repairing/replacing.
City Construction Projects
401 N Morton ST
- Case Date:
- 8/9/1996
She's at Walnut & Wylie. Why hasn't anything been done about Wylie Street in a month or more? She's losing business and Wylie Street residents are using her parking lot.
City Construction Projects
401 N Morton ST
- Case Date:
- 6/10/2003
City Construction Projects
401 N Morton ST
- Case Date:
- 9/5/1997
Steve does not understand why contruction projects around campus and the kirkwood area begin exactly when the students return to school. Why don't they start in the summer when there is much less traffic?