City Construction Projects
2419 W Evergreen DR
- Case Date:
- 5/19/1997
DENNIS SISCOE IS BUILDING A HOUSE AT 2419 W EVERGREEN DRIVE. APPARENTLY HE HAD TO COME ACROSS THE FRONT YARD OF MR. LUCAS' HOUSE TO HOOK ONTO THE CITY SEWER. IT HAS BEEN OVER TWO WEEKS AND THE TRENCH HAS NOT BEEN PROPERLY COVERED. THERE IS SEVERAL ROCK AND DEBRIS IN HIS YARD. HE WANTED TO KNOW IF THIS LINE HAD BEEN INSPECTED AND WHAT CAN BE DONE TO MAKE SISCOE CORRECT THIS PROBLEM. REFERRED TO THE MONROE COUNTY BUILDING DEPARTMENT.
City Construction Projects
615 N Adams ST
- Case Date:
- 5/15/1997
8TH & ADAMS STREET REDEVELOPMENT PROJECT: HALL STATES THAT THE SIDEWALK IS SPALDING VERY BADLY. HE WOULD LIKE TO HAVE SOMEONE FROM THE CITY COME AND WALK THE SITE WITH HIM. HALL STATES THAT THIS IS "THE WORST JOB HE HAS EVER SEEN".
City Construction Projects
110 S Clark ST
- Case Date:
- 9/19/2001
Ms. Ritter stated that a street cut was done in front of her house and that the street cut has fallen in. She thought that the cut was made to repair a gas line, but said that the City made the cut?
City Construction Projects
401 N Morton ST
- Case Date:
- 5/25/2005
citizen querried in re plans for improvement for three locations: rodgers rd between sare and snoody, olcott in hyde park, and generally potholes throughout the city. said they were "aweful".
City Construction Projects
309 N Walnut ST
- Case Date:
- 6/16/1999
sidewalk torn up in the 300 block, in front of Taco Bell (think by gas company) and was never repaired. Has been out for awhile and is a hazard to pedestrians (Carol I also think they did not repair the sidewalk next to Alice's house on Morton and 10th. You may want to address both of these walks with them)
City Construction Projects
401 N Morton ST
- Case Date:
- 10/23/1997
Mr. Sutherland is frustrated and perplexed, that the City has the nerve to take on so many construction projects at one time, especially when all the students are back in town. He had to detour 4 different times just to get to work on the west side of town. He thinks this is very poor planning on the part of the City, and he'd like to know how all of this construction can be scheduled to take place at the same time?
City Construction Projects
501 E 7th ST
- Case Date:
- 7/14/1997
Trash, concrete, etc., left on sidewalks from remodeling and curb cut. Vehicles are parked on sidewalks.
City Construction Projects
312 N Park Ridge RD
- Case Date:
- 5/12/1997
She called to lodge a complaint about the speed humps that have been installed on Morningside Drive. She lives in Park Ridge east and can't "catch the light" at Smith and 3rd and can't use 10th Street because of the "awful bicycles". She says we have just created "one large driveway " for the people who live on Morningside.
City Construction Projects
2425 N Headley RD
- Case Date:
- 8/15/1996
Citizen says there is a utility cut right where Headley road curves around in front of Headley School (where Matlock becomes Headley). Says its been there for about a month and needs to be filled in. Believes it was City Utilities working there but not sure.
City Construction Projects
101 S Smith RD
- Case Date:
- 5/28/1996
AT THE CORNER OF MORNINGSIDE DRIVE & SMITH ROAD. THE CITY FINISHED THEIR PROJECT OUT THERE ABOUT A YEAR AGO THERE IS A SMALL PLOT OF LAND AT THIS INTERSECTION THAT HAD SOD PUT DOWN. THE GRASS DIED AND MR. BROTHERS WOULD LIKE FOR THE CITY TO REPLACE THIS PORTION. THIS AREA IS IN THE CITY RIGHT OF WAY. JANE FLEIG DID GO OUT TO TAKE A LOOK AT SITE ON 5/28/96.