City Construction Projects
401 N Morton ST
- Case Date:
- 8/9/1996
Sidewalk on Maple from 5th to 6th was recently replaced. While it needed to be replaced, this was a historic sidewalk as are many on the west side. Policy should be developed to preserve historic sidewalks in original condition when repairing/replacing.
City Construction Projects
401 N Morton ST
- Case Date:
- 8/9/1996
She's at Walnut & Wylie. Why hasn't anything been done about Wylie Street in a month or more? She's losing business and Wylie Street residents are using her parking lot.
City Construction Projects
401 N Morton ST
- Case Date:
- 6/10/2003
City Construction Projects
401 N Morton ST
- Case Date:
- 9/5/1997
Steve does not understand why contruction projects around campus and the kirkwood area begin exactly when the students return to school. Why don't they start in the summer when there is much less traffic?
City Construction Projects
401 N Morton ST
- Case Date:
- 5/25/2005
citizen querried in re plans for improvement for three locations: rodgers rd between sare and snoody, olcott in hyde park, and generally potholes throughout the city. said they were "aweful".
City Construction Projects
401 N Morton ST
- Case Date:
- 10/23/1997
Mr. Sutherland is frustrated and perplexed, that the City has the nerve to take on so many construction projects at one time, especially when all the students are back in town. He had to detour 4 different times just to get to work on the west side of town. He thinks this is very poor planning on the part of the City, and he'd like to know how all of this construction can be scheduled to take place at the same time?
City Construction Projects
401 N Morton ST
- Case Date:
- 8/28/2024
What is happening again on Clarizz street. How much money and time has the city wasted on what ever project this is. Surely we have better uses for our resources. Connie Clark
City Construction Projects
4021 E Morningside DR
- Case Date:
- 7/25/2017
I just took possession of a home I bought as sidewalk construction on E. Morningside was being completed. The home is at 4021 E. Morningside. It is my understanding the City redid part of the driveway after having to destroy it for sidewalk work. Unfortunately it appears a corner of the drive (front right / SE) is already cracking/chipping/spalling (see photo). I'm requesting the City patch this up before it continues to flake (not huge now but would like addressed so as not to spread) as an area driven over frequently. Otherwise looks fantastic and very happy with the new sidewalk and drive portion. Great neighborhood addition.
City Construction Projects
409 E 3rd ST
- Case Date:
- 12/5/2022
This is the third day in a row that I’ve had to deal with the sound of cars driving over these metal plates. It’s extremely loud and I’m very tired because I can’t sleep at night with the sound of every single car that bangs over it! If there’s something that can be done about it please help. I’m very tired
City Construction Projects
417 W Kirkwood AVE
- Case Date:
- 6/1/2021
This is located at the Southeast corner of the parking lot. This is one of several trees needing attention. We would prefer this one to be removed. Also, the broken-off trunk was from a storm damaged tree 2 years ago. Can we get that removed, or at least cut flush to ground level? We are converting these mulch beds to rock beds.