City Construction Projects
226 S College AVE
- Case Date:
- 6/12/2023
I was walking along the North side of 3rd st with my children and found the railing here was easy to move and break. I can see there were a few stablizing posts but the are not working. It is broken and unsafe and any adult who doesn't know this and leans on this or tips into it could easily fall onto 3rd st. Please fix asap
City Construction Projects
214 E 15th ST
- Case Date:
- 4/20/2022
Construction site utilizing alleyway creating potholes and divots
City Construction Projects
205 E 17th ST
- Case Date:
- 8/22/2015
Water shut off cover missing
City Construction Projects
1398 W 8th ST
- Case Date:
- 9/5/2020
Huge hole in the road on the corner of 8th and Fountain.
City Construction Projects
1210 W 8th ST
- Case Date:
- 12/14/1995
Street Dept. is installing a handicap ramp in front of his property. He says that the property is not handicap accessible and that there shouldn't be a ramp there. Sidewalk crews told him that they are required to put in ramps per ADA.
City Construction Projects
1103 N Woodburn AVE
- Case Date:
- 1/22/2003
Letter stated Mr. Schatz feels that a crack (leak) in his pvc pipe connector to meter was caused by damage during construction. Customer had break repaired but received extra large water bill. Wants matter investigated and adjustment made.
City Construction Projects
110 S Clark ST
- Case Date:
- 9/19/2001
Ms. Ritter stated that a street cut was done in front of her house and that the street cut has fallen in. She thought that the cut was made to repair a gas line, but said that the City made the cut?
City Construction Projects
105 W 4th ST
- Case Date:
- 1/12/2022
Level 1 stairway exit (alley way access) - Standpipe (Fire Dept.) leaking and water is accumulating on landing in front of exit door, may ice as temps fall.
City Construction Projects
1010 W 7th ST
- Case Date:
- 12/7/2018
The manhole cover for the sewer on W 7th Street close to Elm is not secured. I stepped on it and it moved under me and I almost fell in the hole.
City Construction Projects
101 S Smith RD
- Case Date:
- 5/28/1996
AT THE CORNER OF MORNINGSIDE DRIVE & SMITH ROAD. THE CITY FINISHED THEIR PROJECT OUT THERE ABOUT A YEAR AGO THERE IS A SMALL PLOT OF LAND AT THIS INTERSECTION THAT HAD SOD PUT DOWN. THE GRASS DIED AND MR. BROTHERS WOULD LIKE FOR THE CITY TO REPLACE THIS PORTION. THIS AREA IS IN THE CITY RIGHT OF WAY. JANE FLEIG DID GO OUT TO TAKE A LOOK AT SITE ON 5/28/96.