closed #66048

City Construction Projects

401 N Morton ST

Case Date:
10/23/1997

Mr. Sutherland is frustrated and perplexed, that the City has the nerve to take on so many construction projects at one time, especially when all the students are back in town. He had to detour 4 different times just to get to work on the west side of town. He thinks this is very poor planning on the part of the City, and he'd like to know how all of this construction can be scheduled to take place at the same time?

closed #118754

City Construction Projects

401 N Morton ST

Case Date:
9/5/1997

Steve does not understand why contruction projects around campus and the kirkwood area begin exactly when the students return to school. Why don't they start in the summer when there is much less traffic?

closed #118795

City Construction Projects

304 S Rogers ST

Case Date:
8/28/1997

After traffic calming device was installed at the corner of 3rd and Rogers, sidewalk had to be realigned. Realigning meant tree had to be dug up and the lawn in this area was never fixed. See letter

closed #67178

City Construction Projects

501 E 7th ST

Case Date:
7/14/1997

Trash, concrete, etc., left on sidewalks from remodeling and curb cut. Vehicles are parked on sidewalks.

closed #119217

City Construction Projects

2535 W Evergreen DR

Case Date:
6/12/1997

MR. LUCAS CALLED AND STATED THAT SEWER LINES WERE INSTALLED TWICE IN A YEAR (THE LAST BEING ABOUT 5 WEEKS AGO) AND THAT DAMAGE WAS DONE TO HIS PROPERTY AND HAS NOT YET BEEN REPAIRED.

closed #119358

City Construction Projects

2419 W Evergreen DR

Case Date:
5/19/1997

DENNIS SISCOE IS BUILDING A HOUSE AT 2419 W EVERGREEN DRIVE. APPARENTLY HE HAD TO COME ACROSS THE FRONT YARD OF MR. LUCAS' HOUSE TO HOOK ONTO THE CITY SEWER. IT HAS BEEN OVER TWO WEEKS AND THE TRENCH HAS NOT BEEN PROPERLY COVERED. THERE IS SEVERAL ROCK AND DEBRIS IN HIS YARD. HE WANTED TO KNOW IF THIS LINE HAD BEEN INSPECTED AND WHAT CAN BE DONE TO MAKE SISCOE CORRECT THIS PROBLEM. REFERRED TO THE MONROE COUNTY BUILDING DEPARTMENT.

closed #119377

City Construction Projects

615 N Adams ST

Case Date:
5/15/1997

8TH & ADAMS STREET REDEVELOPMENT PROJECT: HALL STATES THAT THE SIDEWALK IS SPALDING VERY BADLY. HE WOULD LIKE TO HAVE SOMEONE FROM THE CITY COME AND WALK THE SITE WITH HIM. HALL STATES THAT THIS IS "THE WORST JOB HE HAS EVER SEEN".

closed #67917

City Construction Projects

312 N Park Ridge RD

Case Date:
5/12/1997

She called to lodge a complaint about the speed humps that have been installed on Morningside Drive. She lives in Park Ridge east and can't "catch the light" at Smith and 3rd and can't use 10th Street because of the "awful bicycles". She says we have just created "one large driveway " for the people who live on Morningside.

closed #70671

City Construction Projects

2425 N Headley RD

Case Date:
8/15/1996

Citizen says there is a utility cut right where Headley road curves around in front of Headley School (where Matlock becomes Headley). Says its been there for about a month and needs to be filled in. Believes it was City Utilities working there but not sure.

closed #121146

City Construction Projects

401 N Morton ST

Case Date:
8/12/1996

Says promised traffic calming devices have not been installed. Were told they'd go in right away (6th St). Says City Landscaper told him no one discussed watering of greenery with him. Says City departments aren't coordinating and work isn't getting done.