City Construction Projects
111 E 6th ST
- Case Date:
- 6/11/2026
There is construction happening in the alleyway of 111 E 6th St, which is behind the Btown Smoke Time (corner of walnut and sixth). My apartment is in this alleyway, and there is no other access besides the alley door. The construction is currently blocking me from entering my apartment, and is blocking my roommate from leaving the apartment, because they have torn the alley out and blocked any alley entrance with heavy machinery. While I’m sure this was a necessary project, this is something that needs to be informed to residents if they are going to be blocking them inside/outside of their homes.
City Construction Projects
335 S College AVE
- Case Date:
- 6/10/2026
Construction crew blocking the sidewalk. No flagger. Pedestrians forced into Street. Thank you.
City Construction Projects
3230 S Walnut ST
- Case Date:
- 6/8/2026
Sidewalk at the ongoing construction at new Bloomington Fire Operations Center is blocked with no alternate accessible path for pedestrians. Wheelchair user had to use the vehicle driving lane on busy road in order to get around the blocked sidewalk, because the shoulder of the road was also obstructed by cones and tape.
City Construction Projects
- Case Date:
- 5/21/2026
I appreciate the paving happening and the difficulty in controlling traffic around it downtown, but the crews need more signs and flaggers ASAP
City Construction Projects
201 N Morton ST
- Case Date:
- 5/20/2026
I understand you are actively working to pave this street, but these loose asphalt ramps are not accessible. Very hard to use with a wheelchair, it's like trying to wheel through beach sand. No signage directing pedestrians to a different accessible crossing area
City Construction Projects
350 W 7th ST
- Case Date:
- 5/20/2026
I understand you are actively working to pave this street, but these loose asphalt ramps are not accessible. Very hard to use with a wheelchair, it's like trying to wheel through beach sand. No signage directing pedestrians to a different accessible crossing area
City Construction Projects
2nd St & Walker St
- Case Date:
- 5/19/2026
Why are the street cuts so poorly done and do called repaired 2nd street. Done are not bad and others are terrible. I understand that a new road is supposed to going in, but our cars are getting beat up.
Also since when does the city allow patching concrete sidewalks with asphalt? I assume all that is coming out to be replaced with concrete again. I assume we’re having lovely bike lanes incorporated into this new construction project that very few people will use. Thank you for using our tax money to a fullest extent of your dreams.
City Construction Projects
936 W 2nd St
- Case Date:
- 5/7/2026
2nd St is trashed from S Walker Street to Buildings Trade Park. Recent construction did a terrible job patching their work, it’s hazardous in many places.
City Construction Projects
1701 E Greenbriar LN
- Case Date:
- 5/5/2026
As a result of AT&Ts recent fiber optics installation, there are two large sink wholes next to the sidewalk between my address and my neighbors house. I called Austin Voorheis who did the installation for AT&T, but he has not come to fill in the openings. Photo's attached. This is really dangerous.
City Construction Projects
335 S College AVE
- Case Date:
- 4/20/2026
Construction crews for the convention center are regularly blocking the drive to 335 S. College.