uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (252)

closed #128329

City Construction Projects

100-198 E Smith Ave

Case Date:
8/31/2012

It is not as safe as it should be to drop off and pickup students at the project school. The construction and parent traffic is directed to the alley between walnut street and Washington street. Often this vehicle traffic fails to yield to pedestrians making walking with children very worrisome.

closed #129266

City Construction Projects

Case Date:
10/16/2012

i noticed a very dangerous situation that needs to be fixed. on the old part of west 3rd street that is still 2 lanes, beside the cresent donut shop, it is very narrow there, & i noticed that the edge of the street there is crumbling away. when it starts snowing in a month or 2, it will be even more dangerouse, because as the snow accumulates it can form a false shelf effect. in other words, the street there could look wider than it really is, so a driver could easily go over the edge & down into a little creek under there. please fix. thank you

closed #131167

City Construction Projects

1016 S Mitchell ST

Case Date:
4/2/2013

A new sidewalk in this area was installed, but the road doesn't seem to be finished. There are huge potholes and it is unsafe for bikes, pedestrians, and vehicles.

closed #133715

City Construction Projects

Case Date:
8/27/2013

Road construction project on South Rogers St. Particular address 2018 S. Rogers. My elderly aunt (85 yrs old) lives at the back of this driveway. For the second time this summer I have had to complain about her driveway being inaccessible. We can park on the street to visit, but because of her physical condition she cannot walk to the street to our cars. Last Wednesday concrete was poured, a family member talked to someone on the construction crew and was told it couldn't be driven on until Monday. This is Tuesday and the driveway is still inaccessable! How many days is a person expected to stay in their home because of this? I called the Public Works number earlier this summer, unfortunately I don't recall the date, but it was on a Friday and I asked to speak to the person in charge of this project, I was given Justin Wykoff's voice mail. He never returned my call. I called 339-1444 after normal work hours and they also tried to give me Justin's name but I said he never returned my call and it was urgent that we get this driveway accessible so she could leave her home. I was given the Contractor's phone number, I left a message for him, didn't receive a call back so I called him again around 8:30 that evening and he said he would get it fixed on Saturday. It was fixed by 10:30 Saturday morning. I never heard anything from Justin. I called Justin Wykoff again this afternoon and left a message, I have not received a call back. I went by there this evening at 5:30 and took pictures which I am attaching to show the current state of the driveway. We need to get her out of the house, she's elderly but that doesn't mean she should be trapped in her house. It should be a common courtesy if nothing else for Justin to return my call and at least tell me when we can get in her driveway. Would it be better if I just contact the newspaper next time and let them know that city employees and the contractors the city does business with does not care about our elderly citizens being stuck in their homes for more than 7 days because of this construction project? I'm sure there are other elderly people living in the midst of this construction but their homes may be closer to the street or they may not have someone to complain for them. I'm not sure what can be done to avoid this situation during the remainder of this construction, but I think every option should be considered beforehand for the elderly or handicapped citizens. I would like for Justin Wykoff to call me at the above number and explain to me what the delay is in gettin this driveway open and why he has not returned my calls. He could have at least followed up with me on the first complaint to make sure it was resolved.

closed #120942

City Construction Projects

S ADAMS ST

Case Date:
11/7/1996

STREET CAVING IN WHERE WORK WAS DONE

closed #121079

City Construction Projects

700 S Walnut ST

Case Date:
9/9/1996

Ms. Borhan said the City tore up her driveway approximately a year ago and promised to return landscaping and everything back to "as was". She has not had any landscaping done and there is mud at the driveway.

closed #121146

City Construction Projects

401 N Morton ST

Case Date:
8/12/1996

Says promised traffic calming devices have not been installed. Were told they'd go in right away (6th St). Says City Landscaper told him no one discussed watering of greenery with him. Says City departments aren't coordinating and work isn't getting done.

closed #121156

City Construction Projects

401 N Morton ST

Case Date:
8/9/1996

Sidewalk on Maple from 5th to 6th was recently replaced. While it needed to be replaced, this was a historic sidewalk as are many on the west side. Policy should be developed to preserve historic sidewalks in original condition when repairing/replacing.

closed #121157

City Construction Projects

401 N Morton ST

Case Date:
8/9/1996

She's at Walnut & Wylie. Why hasn't anything been done about Wylie Street in a month or more? She's losing business and Wylie Street residents are using her parking lot.

closed #121165

City Construction Projects

3751 W Tapp RD

Case Date:
8/7/1996

Mr. Hoover called to complain about the recent construction on Tapp Road. He believes the construction caused his driveway to crack. I referred Mr. Hoover to Risk Management Department.