closed #68215

City Construction Projects

1969 S Henderson ST

Case Date:
4/18/1997

ELEANOR BARKLEY CALLED ON 4/18/97. SHE WANTED TO COMPLAINED ABOUT CONSTRUCTION WORK DONE IN THE VICINTY OF HER APTS. AT 2ND & ADAMS. APPARENTLY, A WATER LINE WAS CUT BY THE CREW DOING THE WORK ON 4/15/97. THIS CAUSED MUD BUILDUP IN THE LINES IN HER APTS. MS. BARKLEY HAD TO PAY OUT A CONSIDERABLE AMOUNT OF MONEY TO CLEAN UP THE MESS AND MAKE THE APTS. LIVABLE FOR HER TENANTS. MS. BARKLEY FEELS THAT SHE SHOULD BE REIMBURSED FOR HER EXPENDITURES. SHE DOES NOT KNOW IF CREW WAS COB, CBU, OR PRIVATE.

closed #68380

City Construction Projects

1604 S Rogers ST

Case Date:
4/7/1997

A CONCERNED CITIZEN CAME INTO THE ENGINEERING DEPARTMENT REGARDING THE CULVERT PIPE INSTALLED ON SOUTH ROGERS STREET ( A FEW YARDS NORTH OF #1604) AT THE RAILROAD TRACKS. THE GROUND/ROAD ON THE SOUTHEAST CORNER IS ERODING AWAY CAUSING A STEEP DROP OFF. REYNOLDS COMPANY DID A ROAD PROJECT AT THIS AREA APPROXIMATELY LAST YEAR OR THE YEAR BEFORE. THE CITIZEN IS CONCERNED THAT THE ROAD WILL CONTINUE TO ERODE AWAY, COULD SOMEONE FROM THE ENGINEERING DEPARTMENT TAKE A LOOK AT THE PIPE.

closed #69593

City Construction Projects

3950 W Tapp RD

Case Date:
1/21/1997

MS. BRIDGES CALLED TO COMPLAIN THAT WHEN NEW WATER LINE WAS PUT IN TAPP RD. WAS TORN UP AND WAS ONLY PATCHED, NOT REPAVED. SHE CALLED UTILITIES AND WAS INFORMED THAT ROAD WOULD BE REPAVED BY CONTRACTOR IN DECEMBER. ROAD HAS NOT BEEN REPAVED AS OF TODAY.

closed #70268

City Construction Projects

S ADAMS ST

Case Date:
11/7/1996

STREET CAVING IN WHERE WORK WAS DONE

closed #70671

City Construction Projects

2425 N Headley RD

Case Date:
8/15/1996

Citizen says there is a utility cut right where Headley road curves around in front of Headley School (where Matlock becomes Headley). Says its been there for about a month and needs to be filled in. Believes it was City Utilities working there but not sure.

closed #71125

City Construction Projects

101 S Smith RD

Case Date:
5/28/1996

AT THE CORNER OF MORNINGSIDE DRIVE & SMITH ROAD. THE CITY FINISHED THEIR PROJECT OUT THERE ABOUT A YEAR AGO THERE IS A SMALL PLOT OF LAND AT THIS INTERSECTION THAT HAD SOD PUT DOWN. THE GRASS DIED AND MR. BROTHERS WOULD LIKE FOR THE CITY TO REPLACE THIS PORTION. THIS AREA IS IN THE CITY RIGHT OF WAY. JANE FLEIG DID GO OUT TO TAKE A LOOK AT SITE ON 5/28/96.

closed #71679

City Construction Projects

1210 W 8th ST

Case Date:
12/14/1995

Street Dept. is installing a handicap ramp in front of his property. He says that the property is not handicap accessible and that there shouldn't be a ramp there. Sidewalk crews told him that they are required to put in ramps per ADA.

closed #73854

City Construction Projects

806 W 4th ST

Case Date:
6/20/2011

The sidewalks in front of 806 & 810 W. 4th Street are in very poor condition. They are crumbling and cracked. They are hazardous to walk across and need to be replaced.

closed #74542

City Construction Projects

1924 E Marilyn DR

Case Date:
4/5/2011

Received email from Leland Rogers concerned about the timing of the Marilyn Drive Sidewalk Project.

closed #36516

City Construction Projects

2215 W 3RD ST

Case Date:
6/16/2004

Mr. Potter expressed disapproval and a desire for the West Third Street Phase II project to utilize two way left turn lanes instead of a raised median.