uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (140)

closed #159806

City Construction Projects

201-251 North Lincoln Street

Case Date:
6/21/2017

Hi, There's a couple of large road cuts at the intersection of Lincoln and 6th St. If the city is not planning on filling these any time soon could we at least get the sharp edges softened? Sometimes I've seen this done and it makes road cuts much easier to drive over without damaging your tires. Thanks, Vickie Nelson Bloomington

closed #147579

City Construction Projects

205 E 17th ST

Case Date:
8/22/2015

Water shut off cover missing

closed #179583

City Construction Projects

214 E 15th ST

Case Date:
4/20/2022

Construction site utilizing alleyway creating potholes and divots

closed #172047

City Construction Projects

2208 E Arden DR

Case Date:
3/22/2020

Hello -- this cover has a hole in it and that seems dangerous.

closed #179625

City Construction Projects

2225 S High ST

Case Date:
4/23/2022

A new walkway and rail was installed in 2020 along Rogers Road to make it safer for children to walk to school. Shortly after it was completed a tree fell and damaged the railing for a bridge which is about 15 feet above Jackson Creek. The tree was removed but the railing was not repaired, it was simply wrapped with caution tape. This may have been adequate temporarily but it has been left this way for over a year. This is unsafe and an eyesore. Can you please arrange to have this properly repaired?

closed #184157

City Construction Projects

226 S College AVE

Case Date:
6/12/2023

I was walking along the North side of 3rd st with my children and found the railing here was easy to move and break. I can see there were a few stablizing posts but the are not working. It is broken and unsafe and any adult who doesn't know this and leans on this or tips into it could easily fall onto 3rd st. Please fix asap

closed #173675

City Construction Projects

237 E Winslow Rd, Bloomington, IN 47401, USA

Case Date:
9/11/2020

You did a great job fixing the crosswalks; thank you! We use those sidewalks frequently. However, pedestrians wishing to use the crosswalk to traverse Henderson on the south side of Winslow now face road flooding for hours/days after significant rain. The east side of the crosswalk and northbound road flood. Not only is this a problem for pedestrians, but it may present an ice hazard for vehicles in the winter months after a thaw-freeze. The crosswalk project plans available for viewing online do not seem to show a drain to collect and remove rainwater. Thank you for helping us all by addressing this!

closed #173347

City Construction Projects

2638 S Isabel CT

Case Date:
8/13/2020

Overgrown tree is dangerously close to our house. Its root system is damaging our driveway, is intertwined with our electrical boxes, and have roots hitting our house. We are requesting the removal of the tree and roots and the replanting of a new one. Please advise as we want to ensure that the overgrowth doesn't overlap with the winter months. There are better pictures, however, I can only upload 1 of them. Thank you.

closed #173542

City Construction Projects

2701 E 3rd ST

Case Date:
8/30/2020

Deep, wide pothole(s) in the roadway due north of the CVS Pharmacy, E. 3rd and College Mall Road.

closed #183420

City Construction Projects

2711 N Dunn ST

Case Date:
4/13/2023

Workers installing optic fiber cable in the neighborhood have left tools, trash, and a 15-20 foot pipe in our yard. We picked scattered stuff up but can't do anything with the tubing and pipe.