uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (241)

closed #162344

City Construction Projects

436 E Laurelwood DR

Case Date:
1/18/2018

Thank you Bloomington Sanitation!

closed #162363

City Construction Projects

4404-4498 Weymouth Lane

Case Date:
1/19/2018

Unable to find info on website related to redeeming old trash or yard waste stickers

closed #166562

City Construction Projects

4612 W Arlington RD

Case Date:
11/15/2018

Where the new water line is going in on Arlington/17th there is cut actoss the road at the 46 bridge. It has been pretty deep to drive across but today on my way home the west bound lane has ~6inch drop towards the shoulder. Even slowing down I was afraid I damaged my car because you cant see the drop until you have already drove across it. Im in a bigger vechicle and it was a huge jar...

closed #150055

City Construction Projects

47403

Case Date:
12/31/2015

Erosion due to over sized semi's

closed #187276

City Construction Projects

500 W 7th ST

Case Date:
2/12/2024

Why there detour sign on seventh street

closed #181310

City Construction Projects

500 W Fairway LN

Case Date:
9/1/2022

New construction site on South Rogers is scattering debris on the road. I live in Clear Creek housing edition and have to travel on South Rogers every day for work. In the past 2 weeks I have had two separate issues with the same brand of screws in my back left tire. I travel on I69 for work and have been traveling at 60 miles an hour with a screw in my tire. This has happened twice in two weeks at no fault of my own. This set of tires is less than 6 months old and today I found out from Royal Mazda that I need to purchase a new tire. This is unacceptable from a point of safety for the South Rogers neighborhood and an additional cost to citizen(s) of Bloomington.

closed #125782

City Construction Projects

500-520 S Walnut St

Case Date:
4/18/2012

Regarding construction on South Walnut Street- at the intersection with second street, motorists are trying to go north from both lanes south of second into the single lane north of second street. These lanes need to be clearly marked during construction as typically the far left lane is for left turns only. Please make it easier for people to know where to go. Thanks.

closed #67178

City Construction Projects

501 E 7th ST

Case Date:
7/14/1997

Trash, concrete, etc., left on sidewalks from remodeling and curb cut. Vehicles are parked on sidewalks.

closed #167577

City Construction Projects

501 N Morton ST

Case Date:
2/21/2019

There is several huge Pot Holes that need to be repaired close to 1005 N Jordan Ave. My daughter got a Flat Tire last night after hitting one.

closed #121873

City Construction Projects

502 N INDIANA AVE

Case Date:
8/1/1995

WITH THE NEW SIDEWALK GOING IN ON 500 BLOCK OF INDIANA, MR. DEKALB IS CONCERNED ABOUT HIS RETAINING WALL.