closed #160285

City Construction Projects

4021 E Morningside DR

Case Date:
7/25/2017

I just took possession of a home I bought as sidewalk construction on E. Morningside was being completed. The home is at 4021 E. Morningside. It is my understanding the City redid part of the driveway after having to destroy it for sidewalk work. Unfortunately it appears a corner of the drive (front right / SE) is already cracking/chipping/spalling (see photo). I'm requesting the City patch this up before it continues to flake (not huge now but would like addressed so as not to spread) as an area driven over frequently. Otherwise looks fantastic and very happy with the new sidewalk and drive portion. Great neighborhood addition.

closed #66048

City Construction Projects

401 N Morton ST

Case Date:
10/23/1997

Mr. Sutherland is frustrated and perplexed, that the City has the nerve to take on so many construction projects at one time, especially when all the students are back in town. He had to detour 4 different times just to get to work on the west side of town. He thinks this is very poor planning on the part of the City, and he'd like to know how all of this construction can be scheduled to take place at the same time?

closed #96393

City Construction Projects

401 N Morton ST

Case Date:
5/25/2005

citizen querried in re plans for improvement for three locations: rodgers rd between sare and snoody, olcott in hyde park, and generally potholes throughout the city. said they were "aweful".

closed #121146

City Construction Projects

401 N Morton ST

Case Date:
8/12/1996

Says promised traffic calming devices have not been installed. Were told they'd go in right away (6th St). Says City Landscaper told him no one discussed watering of greenery with him. Says City departments aren't coordinating and work isn't getting done.

closed #121156

City Construction Projects

401 N Morton ST

Case Date:
8/9/1996

Sidewalk on Maple from 5th to 6th was recently replaced. While it needed to be replaced, this was a historic sidewalk as are many on the west side. Policy should be developed to preserve historic sidewalks in original condition when repairing/replacing.

closed #121157

City Construction Projects

401 N Morton ST

Case Date:
8/9/1996

She's at Walnut & Wylie. Why hasn't anything been done about Wylie Street in a month or more? She's losing business and Wylie Street residents are using her parking lot.

closed #103219

City Construction Projects

401 N Morton ST

Case Date:
6/10/2003

closed #118754

City Construction Projects

401 N Morton ST

Case Date:
9/5/1997

Steve does not understand why contruction projects around campus and the kirkwood area begin exactly when the students return to school. Why don't they start in the summer when there is much less traffic?

closed #69593

City Construction Projects

3950 W Tapp RD

Case Date:
1/21/1997

MS. BRIDGES CALLED TO COMPLAIN THAT WHEN NEW WATER LINE WAS PUT IN TAPP RD. WAS TORN UP AND WAS ONLY PATCHED, NOT REPAVED. SHE CALLED UTILITIES AND WAS INFORMED THAT ROAD WOULD BE REPAVED BY CONTRACTOR IN DECEMBER. ROAD HAS NOT BEEN REPAVED AS OF TODAY.

closed #172545

City Construction Projects

3812 S Laura WAY

Case Date:
5/23/2020

S Laura Way is on a signed, much used bicycle route. Going north from S Jamie Ln it goes downhill for 0.2 miles. A bicycle going down this hill will reach a high speed at the bottom where there is a deep pothole. This road hazard could easily damage a bicycle or flip it over. It is located at 3813 S Laura Way. This pothole should be repaired.