Potholes, Other Street Repair
1022 S Grant ST
- Case Date:
- 4/13/2022
Our alley way floods when there are heavy floods. The neighbors who share this alley are concerned and ask for the city to assess this situation and find a solution. Please contact me for more information. One of the neighbors has a video to share of the water flow. Thanks
Potholes, Other Street Repair
1150-1384 West Gourley Pike
- Case Date:
- 1/9/2017
excessive water runoff from South shoulder creates large patch of ice when cold. there doesn't seem to be appropriate drainage. rest of the street is fine
Potholes, Other Street Repair
1206 S MADISON ST
- Case Date:
- 5/23/2017
Outside her complex, on the western side of the building, the parking area has potholes, so they flood after it rains. She suggested the area be trenched and a drain installed so the water does no continue to pool. Whatever the solution, she would be appreciative if it could be fixed!
Potholes, Other Street Repair
1305-1307 South Hearthstone Court
- Case Date:
- 6/10/2015
There is a section of concrete gutter trough in front of 1311 Hearthstone Court's driveway that is heaving and scraping the bottom of cars as they pull in the drive.
Potholes, Other Street Repair
1600-1606 South Rogers Street
- Case Date:
- 2/7/2017
potholes and low spot gets flooded easily with mud and water forcing pedestrians to walk into busy road from sidewalk.
Potholes, Other Street Repair
2600 W 3rd ST
- Case Date:
- 8/13/2020
There was construction going on for a few months on the entrance into the plaza but has since stopped abruptly. The crew has not been back to finish off the street and all sides of the streets are completely torn apart and damaged. This is unacceptable and can significantly damage one’s vehicle! When is this going to get finished?
Potholes, Other Street Repair
2601-2899 S Henderson St, Bloomington, Indiana, 47401
- Case Date:
- 5/13/2020
What's the plan for getting S. Henderson at Winslow to drain properly?
Potholes, Other Street Repair
3352-3358 East Moores Pike
- Case Date:
- 4/1/2018
The culvert where the creek from "The Fields" crosses under Moores Pike is beginning to fail. The shoulder plus a few inches into the roadway on the south side of the street is beginning to collapse. Past efforts to shore up the roadway have involved dumping rip-rap to prevent undercutting of the roadway but this might be more serious.
I noticed this in the evening and could not get a decent photo.
Potholes, Other Street Repair
911 S High ST
- Case Date:
- 5/4/2017
Can you please look at the drainage on High Street in this area? The street is always covered in water with medium to heavy rains. It doesn't appear that there are enough drains on this area of the street. This has been a problem for years.
Potholes, Other Street Repair
Geological Survey Core Library, N Park Ave, Bloomington, IN 47408, USA
- Case Date:
- 3/19/2022
Bad drainage