closed #202672
Sidewalk & Curb Complaints
212 E 2nd ST
- Case Date:
- 5/13/2025
There is a tree/shrub along the sidewalk growing low foliage that is blocking the line of site when you are turning left onto 2nd Street from Lincoln Street.
There is a tree/shrub along the sidewalk growing low foliage that is blocking the line of site when you are turning left onto 2nd Street from Lincoln Street.
I had previously filled issue 180907. The contractor has not contacted me regarding repair of the damaged sidewalk due to fiber installation. Could you please urge the contractor to remedy the damage to my cement pad. When they installed the fiber, they lifted the cement pad so it is no longer even with the sidewalk making it a tripping hazard.
To Paul Regarding Report #181821. The area is the cement pad between the two trees between the sidewalk and street. The contractors undermined the area under the cement pad and used heavy machinary lifting the cement pad and using heavy machine causing a trip and safety hazard causing an elevation in the cement pad. Attached is a picture. I believe the contractor needs to repair this safety hazard.
So my driveway and the sidewalk has been completely gone for a month now, without any notice from the city. Progress... It has been replaced with loose gravel, a mess of heavy equipment traffic, and ... nothing for many weeks now. My wife cannot drive her small car over this mess without bottoming out. I haven't been able to drive my motorcycle over this mess because it's too soft for a full touring bike. The contractors spend all their time making an even bigger mess of soft gravel. Mayor Hamilton: when will you make this virue signaling mess a priority? I want my front yard back. I want my driveway back. I want my sidewalk back. FINISH IT SOON.
Trip hazard in front of bar!
FINSISH THIS PRJECT
While constructing the Bike Path on the portion of E. Arden Drive to SE Park, crews did not remove the heavy mats blocking storm drains at the corners of S. Williams, Greenfield & Sycamore Courts. When heavy rains appear, water flows into E. Arden Drive, oftentimes ponding in low lying areas. People often drive too fast on that street, causing hazardous driving conditions should they loose control of their car.
I assume you're aware of the damage the gas company has done to the asphalt sidewalk in this area (east side of High St by Childs Elementary), and it looks like they are still working. Please make sure that when they repair the sidewalk, they also repair the area immediately north of their work area up to Rock Creek. They have clearly been driving heavy trucks on it and the edges of the sidewalk are cracked and heaving because of it. You can see at the curb ramp at Rock Creek all their tire marks proving they did it and they've broken the concrete there too. Those of us who use this regularly will greatly appreciate a full repair (don't let them just do the obvious area that they removed). Thanks!
Parents have been complaining to school crossing guard that the sidewalk by the first driveway south of High and Greenbriar is full of mud and the kids have to walk through it. They would like this cleaned up.
Hole in black top