Utilities Construction
6000 S Handy RD
- Case Date:
- 8/28/2013
Received voice message from James Eller, owner and resident of 6000 S. Handy Rd. Mr. Eller alleges that settlement occurred to his yard as a result of CBU's water transmission main project.
Utilities Construction
7046 S Shields Ridge RD
- Case Date:
- 9/4/2013
Resident (Shawn Waylen?) at 7046 S. Shields Ridge Rd. reports that repairs are needed to yard and driveway. The new 36" water transmission pipeline was installed in this area.
Utilities Construction
1900 E Atwater AVE
- Case Date:
- 10/15/2013
Neighbors storm pipe is drianing into customers easement into her back yard. CBU customer
Utilities Construction
700 E Winslow Farm DR
- Case Date:
- 11/5/2013
says her HOA is planning to remove a retention pond behind her house and install a water garden, she does not want this to happen.