Utilities Construction
1913 S Sussex DR
- Case Date:
- 1/11/2024
This is in reference to an issue reported back in November - Case 186167.
AEG was in our neighborhood in over three months ago, and left a haphazard trail of pipes sticking out of the ground, holes covered with thin sheets of plywood, and yards torn up and muddy. Can our neighborhood please have some sort of an update as to when they will be back to finish the job they started? Will yards be repaired and reseeded by this coming spring?
Utilities Construction
1900 E Atwater AVE
- Case Date:
- 10/15/2013
Neighbors storm pipe is drianing into customers easement into her back yard. CBU customer
Utilities Construction
1720 N Kinser PIKE
- Case Date:
- 3/12/2024
Why there utilities road work on kinser pike near classic lane
Utilities Construction
1709 E Circle DR
- Case Date:
- 4/27/2023
Water near hydrant all the time. Either slow leak or natural spring?
Utilities Construction
1607 S Andrew CIR
- Case Date:
- 9/17/2018
Utilities workers were out doing work last year and the hole they dug to work on utilities was never filled in. She reported the hole last year, but it was not resolved. The hole is in the median between the street and the sidewalk. It appears like it is has started collapsing.
Utilities Construction
1600 S Nancy ST
- Case Date:
- 1/4/2019
Smart water meters
Utilities Construction
1273 N Maple ST
- Case Date:
- 11/16/2023
I’m wondering when water is supposed too be back on?
Utilities Construction
122 S College AVE
- Case Date:
- 8/27/2020
There is a yellow plug in the concrete that is a tripping hazard.
Utilities Construction
1210 1/2 S Walnut ST
- Case Date:
- 6/26/2018
Hello,
There has been utilities construction going on by our apartment for over a month now. We understand that there is a lot of noise that comes along with it, especially since they have to break through multiple feet of rock to be able to place new sewer lines. We have been understanding in the last few weeks as rock hammering began at 7AM and went on through 5PM Monday-Friday. Even as this construction extended to Saturdays as well.
As of last night however, the construction went on all night long. I am guessing that since this is a city run construction project that the noise ordinance was overlooked, however with the continued rock hammering this is unacceptable. It is disruptive and prevented us from sleeping through the night (which is especially impressive given that we have grown accustomed to the street noise typical of living on Walnut Street).
Again, we get that this is an important project and that there is a lot of noise that comes along with that. However work through the night cannot continue.
Sincerely,
Brandon Fricke
Utilities Construction
1205 S Collinswood DR
- Case Date:
- 12/10/2022
My water is off. There has been work in the area, but no communication about it. No work occurring today. I am quite disturbed that it appears I might be without water for a while with no information about it.