Utilities Construction
1607 S Andrew CIR
- Case Date:
- 9/17/2018
Utilities workers were out doing work last year and the hole they dug to work on utilities was never filled in. She reported the hole last year, but it was not resolved. The hole is in the median between the street and the sidewalk. It appears like it is has started collapsing.
Utilities Construction
1600 S Nancy ST
- Case Date:
- 1/4/2019
Smart water meters
Utilities Construction
1115 E Ridgemont CT
- Case Date:
- 4/15/2019
Highland and Skylark-Water coming out of the street, crews digging and trying to repair, water shut off at 1527 S. Highland Ave. Would love to know how/if this will effect our water.
Utilities Construction
6000 S Handy RD
- Case Date:
- 8/29/2013
On 08/28/13, I asked CBU field inspector, Mike Runyon, to inspect the site. He did and reported that the area was restored properly and that adding soil and filling in the area requested by the homeowner would create a drainage issue.
Utilities Construction
444 S Patterson DR
- Case Date:
- 8/9/2013
Sewer back up
Utilities Construction
2655 S Sunflower DR
- Case Date:
- 8/9/2013
Storm ditch behind customers property is washing away
Utilities Construction
2800 E Buick Cadillac BLVD
- Case Date:
- 8/13/2013
Hole is developing above storm drain pipe
Utilities Construction
3246 S Coppertree DR
- Case Date:
- 8/15/2013
Customer wanted supervisor to call her, she has a question RE: project on coppertree drive
Utilities Construction
6000 S Handy RD
- Case Date:
- 8/28/2013
Received voice message from James Eller, owner and resident of 6000 S. Handy Rd. Mr. Eller alleges that settlement occurred to his yard as a result of CBU's water transmission main project.
Utilities Construction
1900 E Atwater AVE
- Case Date:
- 10/15/2013
Neighbors storm pipe is drianing into customers easement into her back yard. CBU customer