Blocked Sidewalk
2621 E Nora Hill DR
- Case Date:
- 7/5/2022
Sidewalk at least half blocked by trimmed bushes. Only 24” wide and no way can a wheelchair get through not to mention two walkers side by side . Then around the corner the same property has allowed there evergreens the grow out onto the sidewalk making it difficult for a wheelchair or walker to get past.
Blocked Sidewalk
2621 E Nora Hill DR
- Case Date:
- 6/26/2022
Hedge trimmed to block sidewalk down to a narrow passage
Blocked Sidewalk
2610 E Moores PIKE
- Case Date:
- 6/3/2022
sidewalk is not usable, very overgrown trees
Blocked Sidewalk
2506 E Cedarwood CIR
- Case Date:
- 5/27/2022
Car been parked here for years
Blocked Sidewalk
2405 E Queens WAY
- Case Date:
- 2/26/2024
There is a thorny bush growing into the sidewalk. North east corner of the Montclair & Queens Way intersection. Could it please be trimmed off the sidewalk?
Blocked Sidewalk
2314 E Arden DR
- Case Date:
- 9/23/2021
The sidewalk on Arden leading into Southeast Park has been blocked for weeks now. The Millstone contractors have been using it for construction storage. Could a better spot not be found for storing this equipment, perhaps one that doesn't shut down a pedestrian walkway? Space on the adjoining street could just have easily been used here.
Blocked Sidewalk
2312 S Rogers ST
- Case Date:
- 5/24/2023
There are low hanging tree branches over the sidewalk. Bikes are not able to ride through that section of the sidewalk.
Blocked Sidewalk
2273 S Olde Mill DR
- Case Date:
- 6/29/2021
Overhanging limbs on Winslow farm dr. Between the 2 Olde Mills.
Blocked Sidewalk
2214 E Rock Creek DR
- Case Date:
- 5/6/2024
It's been 3 weeks since my neighbor has had a new driveway installed. He still has the sidewalk taped off. It only takes 2 days for the sidewalk to cure, yet the kids are walking on the street or dirty grass because he has the sidewalk taped off for no reason at this point
Blocked Sidewalk
2110 S High ST
- Case Date:
- 9/3/2021
Millstone has created a massive screwup with their driveways project. The pavement is leading to massive problems with the runoff and also the clearance of driveways onto former basic normal driveways. This whole project is a complete fucskercluck. Is mayor Hamilton's family involved?