uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (74)

closed #150052

Biking & Walking

Case Date:
12/31/2015

Water fountain broken

closed #157748

Blocked Sidewalk

300 W Gordon PIKE

Case Date:
1/17/2017

Sidewalk impassible in front of old water treatment plant on S Walnut across from Royal (west side of street.

closed #156109

Blocked Street

Case Date:
9/20/2016

Bye the water treatment plant on Shadyside Rd. The weeds were cut and left in clumps on the road. Dangerous for drivers and cyclists.

closed #134852

Blocked Street

703 N Washington ST

Case Date:
10/20/2013

Hole I yard by sidewalk White House back door at corner oh Washington and cottage grove. Very dangerous hole. NOT the water meter at 703

closed #135720

Blocked Street

Case Date:
12/21/2013

High water on Walnut south of First Street. Water gushing from manhole in east lane.

closed #147557

City Construction Projects

Indiana University, Bloomington

Case Date:
8/20/2015

Subsidence of manhole cover. (Water) I have seen no less than 3 people stumble due to 1/2" drop. Maybe bevel edge of brick.

closed #147579

City Construction Projects

205 E 17th ST

Case Date:
8/22/2015

Water shut off cover missing

closed #155386

Drainage or Runoff

Case Date:
9/1/2016

The drainage hole in the backyard between 4100 Bill Mallory Bld and 714 S Park Ridge Rd (Gentry Honours) is filled with mud and causing slow drainage and standing water. The drain appears to need a grate covering and possible rip rap to prevent debris from washing into the drain. The standing water which last for a couple days after rain is causing a mosquito infestation. It has become a health hazard. Please let me know how I should proceed. Thanks, Lacey McCoy 812-322-4125 714 S. Park Ridge Rd

closed #157586

Drainage or Runoff

Case Date:
1/3/2017

Standing water over drain. Continuing problem since recent street work.

closed #136488

Drainage or Runoff

Case Date:
2/25/2014

Storm drain at walnut st pike and heather drive not picking up water runoff coming down the hill from south. Runoff deposits large amounts of gravel in the turn lane to heather dr. Reported this several months ago. Drain pipe going a cross the road was cleaned. Real problem is that drain on walnut pike does not catch the water, it swirls by the drain and turns into heather and goes down that drain. Slowing for the turn allows gravel to be deposited in the road. Makes a potentially dangerous turn for cars slowing to turn. Especially when it "ices" up.