uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (63)

open #192640

Utility Construction Projects

1403 W 8th ST

Case Date:
8/2/2024

A rubber boot is on the ground by the power pole. It appears to be an insulator.

open #192653

Utility Construction Projects

2602 N Kinser PIKE

Case Date:
8/3/2024

Tree fallen on power (internet?) lines

open #192654

Utility Construction Projects

2602 N Kinser PIKE

Case Date:
8/3/2024

Tree fallen on power (internet?) lines

open #192804

Utility Construction Projects

Case Date:
8/10/2024

Near the north west corner of my property (801 S. Anita St) there is an uncovered opening to fibre optic conduit. I reported this to a non-city contact for the company (project manager Richard __Heart(?) phone number is 517-302-1270)a Few weeks ago but no action has been taken. Same gentleman to whom I reported some lawn damage caused by their horizontal boring machine, much earlier. Also no action.

closed #151011

Drainage or Runoff

811 South Parkway Drive

Case Date:
3/10/2016

The stormwater runoff inlets at the intersection of Parkway and Middle Court are insufficient to support the amount of stormwater runoff from the entire length of Parkway. This causes flooding at the intersection of Middle Court and Westwood. We need additional to increase the number inlets along the entire length of Parkway in order to alieviate this problem. Mr. Peden has been apprised of this problem. However, acquiring sufficient funding from the City has not been forthcoming.

closed #151344

Sewer Problems (Storm Sewers)

1000 S High ST

Case Date:
4/1/2016

I have traveled High Street between Arden Rd. and 3rd Street twice a day for the last ten years. Every time there is a heavy rain, water accumulates and flows down High Street between E. Mores Pike and 2nd St. forcing me to move to the other lane to avoid going through large amounts of water creating a very unsafe situation. I was delighted to see this section of High Street repaved last summer and noticed the sewers also being worked on. I assumed, incorrectly, that the runoff problem would be corrected during this maintenance project. Since the paving the runoff has actually gotten worse. Are there plans to fix this unsafe situation so cars can travel safely on High Street without endangering drivers and pedestrians? I regularly see in the Herald Times where is city is allocating and spending money on hiking and biking trails, sidewalks and various pedestrian conveniences. Why don’t we spend some of that money on making our streets safe and passable? Looking forward to your reply, Franklin Lograsso Bloomington cc: David Rollo

closed #152586

Drainage or Runoff

2201 E Autumn DR

Case Date:
4/28/2016

I submitted an erosion/drainage issue behind my house (2201 E. Autumn Dr. Bloomington IN 47401). Someone from City called and left a message for me saying that it is on private property therefore City will not take care of it. I showed it to several other folks and in their opinion, it is City's responsibility since the rainwater pipe is the one causing the damage. I am not sure if your site visitors went to the location to verify this. The rain water from the entire neighborhood comes through this pipe and ends in the creek. I am attaching a picture with this form so that you can take a look at it.If the site visitor wants to visit again, this is happening in between (the back of ) houses 2201 and 2200.

closed #154403

Drainage or Runoff

301 E 12th ST

Case Date:
8/1/2016

There is a continuous large puddle that exists on City property (east side of Lincoln just north of 12th Street). This area needs to be filled/regraded ASAP.

closed #154792

Drainage or Runoff

Case Date:
8/14/2016

1631 s olive street bloomington in 47401 This is a formal request for the drainage system to be examined and or for a drain to be established on olive street given the standing flood water over 5 inches high.

closed #154793

Drainage or Runoff

1631 S Olive ST

Case Date:
8/14/2016

1631 s olive street bloomington in 47401 This is a formal request for the drainage system to be examined and or for a drain to be established on olive street given the standing flood water over 5 inches high.