closed #179099
Other
2208 S Fairmount CT
- Case Date:
- 2/27/2022
Bulldozer came to my back yard and damage my drive way and lawn. I will provide a photo of bull dozer in next post.
Bulldozer came to my back yard and damage my drive way and lawn. I will provide a photo of bull dozer in next post.
Bull dozer came through my drive way and damaged drive way and lawn.
Two signs within a inches of each other, one blocking the other. Project has been finished a while I think but this may need attention.
The tulip poplar planted along the S High St recreational path last autumn is showing no signs of life this spring. All of the other tulip poplars in the area are now fully leafed out. This is the last tree in the row that includes the yellowwoods north of Wimbleton St. Would love for it to be replaced this year. Thanks.
One of the new street trees planted by the city after the completion of the new north extension of the Jackson Creek Trail last fall has unfortunately died, and should be replaced. It is sending up suckers at the base, but I don’t think a large shrubby plant is what was intended. Tree is near the property line of the house on High and the house on the corner facing Wimbleton. Thank you!
While constructing the Bike Path on the portion of E. Arden Drive to SE Park, crews did not remove the heavy mats blocking storm drains at the corners of S. Williams, Greenfield & Sycamore Courts. When heavy rains appear, water flows into E. Arden Drive, oftentimes ponding in low lying areas. People often drive too fast on that street, causing hazardous driving conditions should they loose control of their car.
11 weeks now without a driveway. No driveways completed within 2 blocks in 2 weeks. Am still dealing with mud and gravel for the entire summer. WHEN WILL THIS SANDBAGGED PROJECT BE DONE? 3 city blocks without driveways since memorial day. Hamilton you are dead to me.
I had previously filled issue 180907. The contractor has not contacted me regarding repair of the damaged sidewalk due to fiber installation. Could you please urge the contractor to remedy the damage to my cement pad. When they installed the fiber, they lifted the cement pad so it is no longer even with the sidewalk making it a tripping hazard.
To Paul Regarding Report #181821. The area is the cement pad between the two trees between the sidewalk and street. The contractors undermined the area under the cement pad and used heavy machinary lifting the cement pad and using heavy machine causing a trip and safety hazard causing an elevation in the cement pad. Attached is a picture. I believe the contractor needs to repair this safety hazard.
The sidewalk on Arden leading into Southeast Park has been blocked for weeks now. The Millstone contractors have been using it for construction storage. Could a better spot not be found for storing this equipment, perhaps one that doesn't shut down a pedestrian walkway? Space on the adjoining street could just have easily been used here.