Line of Sight
2115 S High ST
- Case Date:
- 8/22/2021
11 weeks now without a driveway. No driveways completed within 2 blocks in 2 weeks. Am still dealing with mud and gravel for the entire summer.
WHEN WILL THIS SANDBAGGED PROJECT BE DONE? 3 city blocks without driveways since memorial day. Hamilton you are dead to me.
Sidewalk & Curb Complaints
2110 S High ST
- Case Date:
- 6/2/2021
So my driveway and the sidewalk has been completely gone for a month now, without any notice from the city. Progress... It has been replaced with loose gravel, a mess of heavy equipment traffic, and ... nothing for many weeks now. My wife cannot drive her small car over this mess without bottoming out. I haven't been able to drive my motorcycle over this mess because it's too soft for a full touring bike. The contractors spend all their time making an even bigger mess of soft gravel. Mayor Hamilton: when will you make this virue signaling mess a priority? I want my front yard back. I want my driveway back. I want my sidewalk back. FINISH IT SOON.
Blocked Sidewalk
2110 E Covenanter DR
- Case Date:
- 8/21/2023
Pickup truck parked on sidewalk, blocking pedestrians; other cars parked on grass in yard.
Potholes, Other Street Repair
2105 E Queens WAY
- Case Date:
- 6/19/2021
Last night (Friday, 19 June), I removed several mats covering drains on Queens Way at High St, just south of Wimbleton on High St, and on Arden near High St. They are part of the Jackson creek Trail Phase II project - but given the immense rain, they were causing dangerous street flooding (several feet high). They will need replacing.
Sidewalk & Curb Complaints
2105 E Queens WAY
- Case Date:
- 8/22/2021
FINSISH THIS PRJECT
Sidewalk & Curb Complaints
2105 E Arden DR
- Case Date:
- 1/15/2022
While constructing the Bike Path on the portion of E. Arden Drive to SE Park, crews did not remove the heavy mats blocking storm drains at the corners of S. Williams, Greenfield & Sycamore Courts. When heavy rains appear, water flows into E. Arden Drive, oftentimes ponding in low lying areas. People often drive too fast on that street, causing hazardous driving conditions should they loose control of their car.
Utility Construction Projects
2104 S Azalea LN
- Case Date:
- 11/7/2022
As you may know, the cable installers are back at work in the Winslow Farms neighborhood (after leaving it uncompleted for well over a year), and they are inflicting significant damage on properties. We came home to find piles of dirt and rock, a new ground box not flush with the ground, and significant damage far up into our lawn from their boring machine--way beyond the utility easement. Further, their work is damaging sidewalks-both cracking the concrete and pushing it up to create tripping hazards. They were rude to our neighbor who confronted them about these issues. Further, they indicated that they were going to trench back between the houses on Azalea, across the conservancy area, to Bayberry. I would like to talk with someone from the city about this excessive damage, how far back onto our property they are allowed to bring their construction equipment before it becomes trespassing, what is an acceptable expectation/timeline for repairs to our lawn, and what sort of plans they may have for trenching back between our houses and across a conservancy area. They posted announcements of their work AFTER they began and a neighbor complained. Please contact me when you can to discuss the ongoing damage this company is doing to our properties and neighborhood.
Sidewalk Requests
2103 E Wimbleton LN
- Case Date:
- 7/19/2021
WHEN will Millstone finish this infernal "path" project? My driveway has been gone for well over a month and it's a mess of almost impassable soft gravel and mud. The easement is an eyesore and my wife can't get her car out of our driveway without bottoming out on the street edge. It's been like this since MAY. Who approved this mess???
- Case Date:
- 11/7/2021
This tension wire is a hazard for cyclists and needs to be well lit for better visibility in the dark. Reflectors on the wire and along the bend in the path would also add to the safety. I am a 7th grade student at Jackson Creek Middle School. I ride my bike to school every day on the High St recreational path at around 7:30 am. It is dark at that time and I use lights on my bike. On Friday, Nov 5, I was biking down the hill towards this spot. I was going fast down this hill to have enough speed for the uphill right past this spot. Unfortunately, even with my bike light, the tension wire and the sudden bend in the path is hard to see in the dark. My shoulder hit the tension wire and knocked me off my bike. My bike had minor damage to the seat.
Potholes, Other Street Repair
2101 S Bent Tree DR
- Case Date:
- 6/25/2024
Sidewalk is half covered by dirt/weeds inhibiting pedestrian access to sidewalk.