closed #148671
Traffic Suggestions
2016 E Hunter AVE
- Case Date:
- 9/25/2015
Crosswalk needs a vertical sign to caution drivers to slow down and respect crosswalk. This is at Hunter and High St.
Crosswalk needs a vertical sign to caution drivers to slow down and respect crosswalk. This is at Hunter and High St.
There are two signs that were blocking the sidewalk all summer saying that the sidewalk ahead was closed for construction. They never served any useful purpose and the construction has been done for weeks. Someone moved them onto the grass, but they should be taken away because you can still bump your head on them.
Please look into case #176344, the issue is getting much worse
The house across the street from us (209 E Wylie) has a ton of cut down branches that are blocking the sidewalk and road. These branches have been sitting there for over a week now.
Sidewalk is half covered by dirt/weeds inhibiting pedestrian access to sidewalk.
This tension wire is a hazard for cyclists and needs to be well lit for better visibility in the dark. Reflectors on the wire and along the bend in the path would also add to the safety. I am a 7th grade student at Jackson Creek Middle School. I ride my bike to school every day on the High St recreational path at around 7:30 am. It is dark at that time and I use lights on my bike. On Friday, Nov 5, I was biking down the hill towards this spot. I was going fast down this hill to have enough speed for the uphill right past this spot. Unfortunately, even with my bike light, the tension wire and the sudden bend in the path is hard to see in the dark. My shoulder hit the tension wire and knocked me off my bike. My bike had minor damage to the seat.
So we're 15 weeks into our driveways being a mess of gravel and mud. And we have been patient about this, hoping that Milestone will give us what we had before. And yet most of these driveways are garbage.. Ok, but we are still without a driveway, without reasonable access to the street (while paying all those taxes) and still dealing with the sloth of Milestone. Congratulations, Mr Hamilton (Bank Lobbyist), you have created a new republican in Bloomington. You suck.
WHEN will Millstone finish this infernal "path" project? My driveway has been gone for well over a month and it's a mess of almost impassable soft gravel and mud. The easement is an eyesore and my wife can't get her car out of our driveway without bottoming out on the street edge. It's been like this since MAY. Who approved this mess???
As you may know, the cable installers are back at work in the Winslow Farms neighborhood (after leaving it uncompleted for well over a year), and they are inflicting significant damage on properties. We came home to find piles of dirt and rock, a new ground box not flush with the ground, and significant damage far up into our lawn from their boring machine--way beyond the utility easement. Further, their work is damaging sidewalks-both cracking the concrete and pushing it up to create tripping hazards. They were rude to our neighbor who confronted them about these issues. Further, they indicated that they were going to trench back between the houses on Azalea, across the conservancy area, to Bayberry. I would like to talk with someone from the city about this excessive damage, how far back onto our property they are allowed to bring their construction equipment before it becomes trespassing, what is an acceptable expectation/timeline for repairs to our lawn, and what sort of plans they may have for trenching back between our houses and across a conservancy area. They posted announcements of their work AFTER they began and a neighbor complained. Please contact me when you can to discuss the ongoing damage this company is doing to our properties and neighborhood.