uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (40)

closed #164968

Utilities Construction

1210 1/2 S Walnut ST

Case Date:
6/26/2018

Hello, There has been utilities construction going on by our apartment for over a month now. We understand that there is a lot of noise that comes along with it, especially since they have to break through multiple feet of rock to be able to place new sewer lines. We have been understanding in the last few weeks as rock hammering began at 7AM and went on through 5PM Monday-Friday. Even as this construction extended to Saturdays as well. As of last night however, the construction went on all night long. I am guessing that since this is a city run construction project that the noise ordinance was overlooked, however with the continued rock hammering this is unacceptable. It is disruptive and prevented us from sleeping through the night (which is especially impressive given that we have grown accustomed to the street noise typical of living on Walnut Street). Again, we get that this is an important project and that there is a lot of noise that comes along with that. However work through the night cannot continue. Sincerely, Brandon Fricke

closed #173511

Utilities Construction

122 S College AVE

Case Date:
8/27/2020

There is a yellow plug in the concrete that is a tripping hazard.

closed #186297

Utilities Construction

1273 N Maple ST

Case Date:
11/16/2023

I’m wondering when water is supposed too be back on?

closed #183614

Utilities Construction

1709 E Circle DR

Case Date:
4/27/2023

Water near hydrant all the time. Either slow leak or natural spring?

closed #187599

Utilities Construction

1720 N Kinser PIKE

Case Date:
3/12/2024

Why there utilities road work on kinser pike near classic lane

closed #186746

Utilities Construction

1913 S Sussex DR

Case Date:
1/11/2024

This is in reference to an issue reported back in November - Case 186167. AEG was in our neighborhood in over three months ago, and left a haphazard trail of pipes sticking out of the ground, holes covered with thin sheets of plywood, and yards torn up and muddy. Can our neighborhood please have some sort of an update as to when they will be back to finish the job they started? Will yards be repaired and reseeded by this coming spring?

closed #186909

Utilities Construction

2001 E Marilyn DR

Case Date:
1/26/2024

The fiber optic guys are here AGAIN! The are digging and drilling through our property. They asked if they could take down some of our fence to do their work. They admit they are back because they did not do a good job BEFORE. Our issue - we are concerned of that these contractors will damage our property sewer and/or water lines and we will be the ones stuck to deal with the aftermath of repairs and expense of repairs. Issue 2 - We have no idea on how to communicate with these guys!! What are our RiGHTS! Can you guys help us out? We feel helpless!

closed #131882

Utilities Construction

2700 N Blue Ridge CT

Case Date:
5/21/2013

On Friday May 17 white flags were placed on both sides of our street - Blue Ridge Drive. Is there some type of work planned for this area? Thanks, Karen Watkins

closed #185949

Utilities Construction

3100 S Coppertree DR

Case Date:
10/12/2023

Grass killed by large piece of equipment left on the turf which should have been left on the street. This occurred during water main replacement over late summer. Requesting repair

closed #174454

Utilities Construction

320 S Maple ST

Case Date:
1/7/2021

Water meter covering busted. Looks like the ureport photo issue still hasn’t been fixed so email me for the photo