closed #161355
Excessive Growth
2200 E 2nd ST
- Case Date:
- 9/29/2017
Overgrown plants making it hard to use the sidewalk on the way to Elementary school
Overgrown plants making it hard to use the sidewalk on the way to Elementary school
The road/sidewalk construction crew sprayed concrete on my car as I was driving down the street. I assume they were cleaning out the cement truck, but ended up spraying the hose as I drove by splattering my car with cement and rocks. I think it will all wipe off and not harden on the car, but I'm not exactly happy about it or having to clean it up.
It's been 3 weeks since my neighbor has had a new driveway installed. He still has the sidewalk taped off. It only takes 2 days for the sidewalk to cure, yet the kids are walking on the street or dirty grass because he has the sidewalk taped off for no reason at this point
I would like to request a sidewalk ramp / crossing be installed at the SE corner of Walnut St Pike and Winslow. It looks like there has previously been an accident there and now there is a concrete barricade and guard rail preventing the pedestrians from crossing. So either the pedestrian has to make a somewhat dangerous crossing there, or cross three extra times to go around and back. Thank you! Michelle Giansante
There are low hanging tree branches over the sidewalk. Bikes are not able to ride through that section of the sidewalk.
The sidewalk on Arden leading into Southeast Park has been blocked for weeks now. The Millstone contractors have been using it for construction storage. Could a better spot not be found for storing this equipment, perhaps one that doesn't shut down a pedestrian walkway? Space on the adjoining street could just have easily been used here.
There is a thorny bush growing into the sidewalk. North east corner of the Montclair & Queens Way intersection. Could it please be trimmed off the sidewalk?
Vegetation is overgrown and blocking sidewalk/path between Nota and Maxwell.
A hole has opened up in the paved sidewalk just east of the Meadowlands apartment complex drive along the north side of rogers road. A metal disc had been covering the hole, but the hole has widened and the cover has fallen in. I live in the Spicewood neighborhood and walk this way frequently--it could be really dangerous for a bike or child walking.
The sidewalk contruction on E Winslow Rd has been going on since winter. The project has more says with no one working on it than working on it. today I saw only 4 men on the whole project and none of them were doing any work at 11 AM. Lots of road projects in Bloomington are started and then left abandoned for months. As a resident I don't like this. If they start something they ought to work on it till finished then move on. Im frustrated with the disruption that has been going on for 7 months for a very small project.