Line of Sight
2821 S Rayle PL
- Case Date:
- 1/2/2024
Not sure if this is formally in the City or not and if HAND has jurisdiction here, but this property has a very tall fence surrounding the property that comes right up to the intersection of Rayle and Fairington. It is so tall and so close to the intersection that a driver cannot see traffic coming around the corner. It is unsightly and, more importantly, dangerous.
Sidewalk & Curb Complaints
613 E 12th ST
- Case Date:
- 1/2/2024
At the NW corner of the intersection of 12th and Fess, there is a relatively new, ADA-compliant sidewalk/curb installation. There may be physical and/or legal reasons for having the center, raised concrete portion present, but it is not obvious and as a result is a trip hazard. We have tripped on it several times. There is a current project at the same intersection, so we were hoping that they could redo it or at least paint the section yellow so that it stands out. It is dangerous the way it is now.
Utility Construction Projects
- Case Date:
- 12/22/2023
do you know when road work done on old hospital
- Case Date:
- 12/19/2023
Path blocked at e Arden dr and s high st. Why are these folks allowed to drive on our paths?
City Construction Projects
- Case Date:
- 12/19/2023
There road work at old hospital
Blocked Sidewalk
1630 E Maplecrest DR
- Case Date:
- 12/16/2023
Utilities Construction
719 W 7th ST
- Case Date:
- 12/15/2023
They had a water line or sewer line emergency at 719 W 7th and contractors tore up a lot of sidewalk on the South Side of W 7th Street in front of the house. Who is responsible for repair or sidewalk? This happened Thursday night and continued all day Friday 12/15. Contractor was Snedegar Construction.
Traffic Related Complaints
1700 E Camby LN
- Case Date:
- 12/15/2023
On going fiber install continues through lunch and doesnt stop by 5. Excess equipment noise and heavy equipment and truck movement.
City Construction Projects
- Case Date:
- 12/12/2023
Will our reports and inquiries be professionally responded to? We cannot get a response from Gray
City Construction Projects
- Case Date:
- 12/12/2023
Kyle do you know when duke project done on 321 Roger street