Drainage or Runoff
307 N Jefferson ST
- Case Date:
- 1/15/2026
Resident (Ron) called to complain about standing water that collects at the end of their driveway apron, which is a few feet from a sewer drain. Resident reported that the problem may be related to developer construction in the area (i.e., staging of concrete with massive trucks) which has damaged curbs and sidewalks. Camera-ing stormwater or other facilities may be warranted. ENG is following up about expressed concerns of damaged public ROW assets (sidewalks, curbs).
Potholes, Other Street Repair
2516 E Eastgate LN
- Case Date:
- 8/14/2025
Richard Moss - 812-639-2296
Complaint is that the road has a steep incline from the center to the curb. This is causing storm water to not drain and leave behind copious amounts of mud and debris. He would like a call back once this is looked at.
Sidewalk & Curb Complaints
- Case Date:
- 6/2/2025
Judy Fulford - 812-325-6537 and [email protected]
Complaint at 702 E 10th Street. Would like some information on the curb placed at her driveway slope. The way it is currently paved over by the city, is causing water to drain straight in her basement. She would like to have this looked at.
Excessive Growth
911 N Maple ST
- Case Date:
- 6/29/2020
Yard waste, claims "poison" being poured on the area where excessive growth. Concerned about "poison" getting into other yards, being near children and the safety of the water supply.
Drainage or Runoff
2017 E Marilyn DR
- Case Date:
- 4/13/2020
Dear Mr. Howard, Mr. Peden, Mr. Meyers, and Mr. Rollo,
We are the property-owners at 2017 E Marilyn Dr. abutting Mr. Howard’s residential construction project at 1110 S. Covenanter Dr (http://howardshomeimprovement.com).
We're writing because we're concerned about the addition of gravel this past week to Mr. Howard’s lot, raising it several feet above our property, creating what looks sure to become a pond of run-off water along the eastern edge of our property and causing likely flooding at the southern edge. A marshy meadow that used to collect water on Mr. Howard’s property has been shifted onto our property.
In order to get a sense of the impacts and the city’s review of them, we are hoping to talk with Mr. Howard and a city inspector before further work proceeds. We are also concerned that the property line has not been staked and our property is being used for construction staging, with considerable removal of vegetation and possible spreading of gravel across the property line.
Here is a rough calculation of the drainage runoff from Mr. Howard’s property onto ours:
The raised area is 30’+60’+10’=100' X 12’ = 1200 sq ft (at the side) and 22’ + 12’ = 34’ X 10’ = 340’ sq ft (at the back) = 1540 sq ft (total).
At an average 5” rainfall in May, that would create 4,800 gallons or 640 cu ft of runoff.
Annually, rainfall is about 50” so the runoff would be about 48,000 gallons or 6400 cu ft per year. But with climate change we suspect those amounts are going to increase (rainfall for every month this year has exceeded the norm).
We arrived at this estimate using the USGS rainfall calculator: https://water.usgs.gov/edu/activity-howmuchrain.html
And we used rainfall estimates from: https://www.weather.gov/ind/Precip_scorecard_IND
For the raised area of Mr Howard’s property, we used the schematics attached below.
We also have attached photographs showing the construction staging on our property, and the effect of the land build-ups on the east side of our property line.
Thank you for your help,
Ben and Jenny Robinson
Potholes, Other Street Repair
1903 E Winslow RD
- Case Date:
- 5/30/2019
Reported a water main break on or about April 20, 2019 that resulted in road damages that have not been fixed.
Drainage or Runoff
1245 W Countryside LN
- Case Date:
- 5/9/2019
Homeowner at 1251 W Countryside Ln contacted CBU Eng Dept on 5/9/19 @ 1:35pm regarding a drainage concern. Drainage ditch running between his home and the neighboring home to the West is holding water. He is concerned for public safety with mosquitos and such since the water is holding for long periods of time. He would like an Engineer to contact him and meet him on site to see what can be done to correct the problem.
Tonia advised the homeowner that the Engineer was not back in the office until 5/13/19. He stated that he understood and that he did not have any immediate concerns about waiting until next week.
- Case Date:
- 9/19/2018
A water fountain in Bryan Park next to the tennis courts is malfunctioning; it has been running continuously for the past few days.
- Case Date:
- 7/12/2018
Litter, water overflow, dumpster overflow in alley behind.
Excessive Growth
823 W 7th ST
- Case Date:
- 6/18/2018
"trash kept on porch; debris and stuff also; unkempt lawn and over-growth alongside of house and in back; water collecting materials in back." Problem exists for years.