open #204755
Potholes, Other Street Repair
1626 E Treadwell LN
- Case Date:
- 8/6/2025
Gravel and broken asphalt that has washout on the street and into their yard, killing their grass.
Gravel and broken asphalt that has washout on the street and into their yard, killing their grass.
Rubbish lying in a driveway
Pothole(s) on Overhill @ Dekist.
Trash can at the Henderson St bus stop is overflowing. Lots of trash in the grass by the storage units
I'm not sure if you are aware, but they are resurfacing Washington and that makes this the PERFECT opportunity to do something here that makes sense, ie: not paint a line and say it's for bikes and hope/pretend that cars don't park in it, because they will. The easiest and most obvious solution is to do nothing, or at most paint a "sharrow". Simple fact is: a car can't block a bike lane if it isn't there.
White Ford E150 Passenger Van with plate UN213 at 520 S Parkway Dr is blocking most of the sidewalk making it inaccessible for wheelchair to go by. As well, they are parked too close to fire hydrant. Thank you.
My trash didn’t get picked up. This is about the 4th time this year. It was on the side of the road right next to the recycling (which did get picked up). I have 4 kids at home I can’t go a whole week without my trash being picked up. Please help!!
pulling out of the parking lot of IU Health SIP office onto Rogers Street you cannot see Rogers Street clearly due to the landscaping being to tall
Received multiple calls that this street is blocked by the construction development of the new apartment complex across the street. Spoke to HAND who transferred me to the Street Division who transferred me to Engineering Department, where I left a voicemail. Multiple residents/vendors of our apartment location there on Lincoln Street have been told that they cannot use the street today d/t construction and as of 20 minutes ago it was blocked. This is the only street in and out of here for us/residents/etc.
Once again Street Department is repaving roads with barely any milling work done, this time on South Washington. Milling down 1' strips less than .5" at the curb and not milling at all in the middle of the road. The "repaving" here is just piling up over an inch of fresh asphalt on top of un-milled asphalt. This raises the grade of the road, which also means curbs are now effectively lower and storm drains that should be at grade are now sitting in a pit of asphalt.