uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (50928)

closed #200754

Street Snow Removal

510 S Rose AVE

Case Date:
2/5/2025

My wife and I live at 510 South Rose Avenue and noticed that last time there was significant snowfall there was no snow removed from our street. We would appreciate it if snow removal took place on our street the next time, which according to the local weather forecast may be early next week. Thank you!

closed #200897

Street Snow Removal

535 E Hickory Stick Dr

Case Date:
2/16/2025

I live in a neighborhood and I am located on a half circle. The snow plows have been through my neighborhood multiple times and have ignored our half circle. This happens every time we get snow. A report has to be made before they plow our half circle.

closed #200947

Street Snow Removal

1521 Isaac Dr

Case Date:
2/17/2025

streets are iced over and very slippery, S Westplex Ave, W Milieu Dr, and Isaac Dr

closed #200955

Street Snow Removal

1600 E Hillside DR

Case Date:
2/17/2025

The sidewalks along the south side of Hillside in the 1600 and 1500 block have not been cleared.

closed #201004

Street Snow Removal

1701 S Springhouse DR

Case Date:
2/19/2025

For the past two snow falls, the cul-de-sac containing my address has not been plowed or salted when all other streets in Renwick have been cleared. The cul-de-sac is on a relatively steep grade so it is difficult to navigate when it has not been treated.

closed #206999

Street Snow Removal

3531 E Covenanter DR

Case Date:
12/2/2025

Need to snow removal

closed #206983

Street Snow Removal

338 S Morton ST

Case Date:
12/1/2025

A request for snow removal practices going forward. The location is where South Morton ends at the Convention Center overflow parking lot. Vehicle traffic is stopped by three yellow bollards, but many pedestrians and cyclists use this road to enter the B-line from Morton St. In past winters, snow plows push the snow into a large pile that entirely blocks off the end of S Morton St, so even pedestrians can't pass through. In the past, I have shoveled a pathway through, but it takes hours depending on the size of the pile and how frozen it is, and I have to redo it every time plows come through, and I go through at least 5 snow shovels per year since they break from the amount of snow I need to move. Now I have a back issue, so I can no longer shovel a path through. Can you please coordinate snow plowing so that the end of S Morton is not entirely blocked? Maybe a smaller plow (like they use on the B-line) could work with the larger plows to keep the path as open as possible. Thank you.

closed #207027

Street Snow Removal

2250 S Element WAY

Case Date:
12/3/2025

I don't know whether these streets are managed by the city or by Regency (or whoever owns the apartments and houses over here), but this morning, the entire stretch of road between the houses and the apartment buildings was solid ice. The road behind the apartment buildings wasn't much better. I slid all over the place trying to leave this morning, and since parking enforcement also never seems to monitor this area, the road between the apartments and the houses is always parked bumper-to-bumper along both sides. So I basically slid between two rows of cars with barely enough room to get through, just sort of praying that I didn't slide into a car. I managed to make it through unscathed, but SOMEONE needs to put salt or ice-melt down on these roads back here. I drove on stretches of solid ice all the way until I reached the road by the elementary school. The entire neighborhood back here was icy or snowy, and since there's too many people parked back through this entire area anyway, getting through there was a nightmare. This was a minor snowstorm in the grand scheme of things - frankly, I'm terrified of what will happen if/when we get a big storm. If the city is responsible for these roads, could someone PLEASE put salt/ice-melt down out here so we can drive safely? If the apartment and/or house owners are responsible for these roads, could someone PLEASE remind them that they need to salt the roads as well as the sidewalks? Thank you.

closed #207173

Street Snow Removal

2306 E. Montclair Ct.

Case Date:
12/14/2025

Snow plow barely plowed our cul de sac at all. They came down one time and didn’t attempt to plow the whole thing. Every year has been great but this is by far the worst attempt that has ever been done at plowing our cul de sac. When will the plow be put to finish the job?

closed #207170

Street Snow Removal

728 W Dixie ST

Case Date:
12/14/2025

No one has came to plow this road at all