uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (120027)

closed #165360

City Construction Projects

800 East 10th Street

Case Date:
8/3/2018

Please see attached photo. This location is at 10th and Park and has been reported to the IU Grounds Dept. as a tripping hazard. The gray bucket is there to indicate a bus pickup for the Boy Scouts that are in town but the metal and the sandbags are blocking the sidewalk, our crews moved the items off the sidewalk and into the homeowners yard. Please pickup. Thanks Jill.

closed #150055

City Construction Projects

47403

Case Date:
12/31/2015

Erosion due to over sized semi's

closed #151354

City Construction Projects

Indiana University, Bloomington

Case Date:
4/4/2016

Road closed signs are knocked over and are in the southbound lane of Woodlawn.

closed #153287

City Construction Projects

Case Date:
6/3/2016

The pavement at the gutter/curb/catch basin in front of my home, 1914 Hackberry Rd, has failed and there is a 12"x12" hole at the catch basin. I am surmising that the connection has failed and has washed out under the pavement. Could you have someone check it out for us. Thanks, john

closed #154032

City Construction Projects

Case Date:
7/12/2016

Citizen called, wanted to stay anonymous, reporting dangerous behavior by road crew working on Old 46. Drove toward her in her lane, head-on.

closed #155501

City Construction Projects

427 N Washington ST

Case Date:
9/6/2016

Sidewalk has lifted due to tree roots

closed #156774

City Construction Projects

Indiana University Bloomington

Case Date:
10/26/2016

Manhole cover removed on west side of Highland Ave. by Lambda Chi House.

closed #125024

City Construction Projects

Case Date:
2/7/2012

Wet cement through entire lane with no covering or cones or signage on 10th east of bypass heading east

closed #125721

City Construction Projects

Case Date:
4/13/2012

Hi, I ride my bike to work from Tamarron to North Walnut. Usually I take the bike route, including the Grimshaw Trail beside the train tracks, then cross the Bypass to Eastgate. Because of the construction on the Bypass, Eastgate is now closed, but there is no warning until you actually get there, which is very inconvenient. I also don't know how else I can get to my destination without either going all way down to 3rd, which would add about 10 minutes to my trip in each direction, or take my life into my hands by riding on 10th (I know, I know, the spandex brigade do this, but at 49 I've moved beyond the "live fast, die young, leave a good looking corpse" philosophy). What I would like to know, is how can I get to work safely if I can't go from the Grimshaw Trail over to Eastgate, and why do you not warn cyclists a little earlier (like say at Pete Ellis Drive and maybe Union Street on the other side) that Eastgate is closed so we don't waste even more time heading in that direction? Thanks, Gerry Matthews

closed #125782

City Construction Projects

500-520 S Walnut St

Case Date:
4/18/2012

Regarding construction on South Walnut Street- at the intersection with second street, motorists are trying to go north from both lanes south of second into the single lane north of second street. These lanes need to be clearly marked during construction as typically the far left lane is for left turns only. Please make it easier for people to know where to go. Thanks.