Letter stated Mr. Schatz feels that a crack (leak) in his pvc pipe connector to meter was caused by damage during construction. Customer had break repaired but received extra large water bill. Wants matter investigated and adjustment made.
- Case Date:
- 2/5/2004
Phyllis & Samuel Guskin wrote re. 1725 E. Hunter Ave. They want to object to a request to subdivide existing single family residential lot at 1900 Atwater. They feel that the land is unsuitable for development because it appears to be a sinkhole. They also feel that the water retention needs should be addressed before any development is permitted. Letter was received by Util. Dept. but referred to COB Planning Dept.
Sidewalk Snow Removal
531 S Westwood DR
- Case Date:
- 8/17/2000
Rec'd. letter from Ann Robinson complaining that rain water stands on parking lot of Highland Village Park causing patrons to step over curbs and that standing water blocks disabled persons' entry into the park. Neighborhood Assn. requests that Utilities Department install a small drain at end of parking and small drainage at large basin on end of Harvey Drive.
Sidewalk Snow Removal
300 E 3RD ST
- Case Date:
- 7/6/1998
See attached letter. Leonard's Home Dry Cleaners is flooding every time there is a big rain. They feel that the flooding has resulted from the inability of the city's storm sewers to handle water running down Third Street from the IU campus.
Temporary Signage w/o permit
1603 E 3rd ST
- Case Date:
- 4/20/1998
Ms. Erskine came in to pay her bill and left a letter stating that she felt a sign should be on the Service Control Center identifying this department as the water co. (or utilities co.).
Water Utility Billing Problems
603 W Wylie ST
- Case Date:
- 2/12/1998
Confusion regarding the Stecker's water bill has caused them distress and concern. Please clear up the situation. See letter.
Water Utility Billing Problems
1708 S Olive ST
- Case Date:
- 2/18/2004
Letter rec'd. from Jackie Bowman Helton requesting appeal by USB Admin. Subcommittee on charges on her account for 1323 W. 8th St. She had a leak in the stool and feels she should not be responsible for water bill due to leak.
Water Utility Billing Problems
3912 W Woodyard RD
- Case Date:
- 2/12/2004
Letter from Cheryl Crider-Jackson indicated she was gone 10 days of billing period in August '03. She believes her water usage was too high for that period and would like review by USB Adm. Subcommittee.
Water Utility Billing Problems
3508 E Morningside DR
- Case Date:
- 1/16/2004
Letter states his basement was flooded. Several days later he noticed that toilet was leaking. He turned off that water. He is claiming adjustment on bill for sewage that did not go through drain and a review by USB.
Water Utility Billing Problems
3247 S Walnut Springs DR
- Case Date:
- 6/2/2003
customer feels $54 charge is unfair. She signed to have the service turned on in advance but utilities was unable to leave the water on. She called on a saturday to have the water turned on. She feels if she had been more informed about make sure all faucets needed to be off and the possibility of a problem this could have been avoided. The letter has been forwarded to Administration.