Utilities Construction
719 W 7th ST
- Case Date:
- 12/15/2023
They had a water line or sewer line emergency at 719 W 7th and contractors tore up a lot of sidewalk on the South Side of W 7th Street in front of the house. Who is responsible for repair or sidewalk? This happened Thursday night and continued all day Friday 12/15. Contractor was Snedegar Construction.
- Case Date:
- 12/21/2023
900 and 1000 block South High Street
Water running down the street, where fiber optic cable is being installed
Utilities Construction
2001 E Marilyn DR
- Case Date:
- 1/26/2024
The fiber optic guys are here AGAIN! The are digging and drilling through our property. They asked if they could take down some of our fence to do their work. They admit they are back because they did not do a good job BEFORE.
Our issue - we are concerned of that these contractors will damage our property sewer and/or water lines and we will be the ones stuck to deal with the aftermath of repairs and expense of repairs.
Issue 2 - We have no idea on how to communicate with these guys!! What are our RiGHTS!
Can you guys help us out? We feel helpless!
Utilities Construction
431 E 10th St, Bloomington, IN 47408, USA
- Case Date:
- 4/11/2024
Small (~7" diameter) metal access cover (valve down there?) labeled "Water" in the middle of 10th street on the east side of the intersection with Dunn is damaged, completely missing the central portion of the lid and creating a hazard if someone steps in it or a small animal falls in. There is also another one with nearly an identical problem (or completely missing) about 50 feet west at the intersection of 10th and a funny little road named "Prow".