closed #61200
Sewer Problems (Sanitary Sewers)
3909 E Bennington BLVD
- Case Date:
- 10/12/1998
SEWER ODOR INSIDE HOUSE HE IS BUILDING IS BAD, WAS WATER IN MANHOLE EARLIER
SEWER ODOR INSIDE HOUSE HE IS BUILDING IS BAD, WAS WATER IN MANHOLE EARLIER
SEWER ODOR IN HOME, RAN WATER DOWN THE SINK DRAINS AND ODOR HAS GONE AWAY
Ms. Sheldon called to complain about water problem in her basement. 3 weeks. ago (approx. 1/23/99) CBU was called because of water backup in their basement. Tom Staley came out after the water receded. She was very upset because Tom Staley was very rude and even got up in her face and talked very loudly. A plumber was called. He found that there was a backup in the sewer line and called the City. Now they have 12" of raw sewage in their basement and cannot live at home.
Sewer cleaning crew cleans every two weeks. Every time, water splashes out of the toilets.
SEWER WATER BUBBLING UP OUT OF A SEWER MANHOLE
Says street was resurfaced 1-2 years ago, changed drainage, water no longer travels to sewer, stops in front of his driveway and pools up. Says street resurfacing raised level so there's no curb and no drainage. Says he has contacted Street and Engineering before.
The street was repaved and now the water does not go to the inlet as it should. It ponds in front of the house and deposited sand into the drive entrance. The sand was from the last snows.
Sewer problems water leaking all over the apartment I1
Parking Enforcement reported water overflowing to Utilities. Linda from Utilities called to report that the clean out is overflowing in the yard at 319 N. Dunn St.
MR. FAULTLESS CALLED MAYOR'S OFC. TO COMPLAIN ABOUT LACK OF CBU DECISION ON SEWERS ON 17TH ST. HE SAID HIS SEPTIC FAILED SO HE NEEDED DECISION ABOUT SEWER IMMEDIATELY. IF CITY DOES NOT INSTALL SEWER, MR. FAULTLESS SAID HE CAN HAVE HIS OWN SYSTEM INSTALLED. MR. FAULTLESS FELT ONE HOLDUP WAS LARGE WATER MAINS ON KINSER. MR. FAULTLESS WOULD LIKE CITY TO TRANSFER MONEY FROM ANOTHER FUND TO CORRECT PROBLEM. MR. FAULTLESS WANTED MAYOR TO FORCE UTILITIES TO MOVE AHEAD WITH PROJECT.