Sewer Problems (Sanitary Sewers)
1018 S Ballantine RD
- Case Date:
- 8/11/2023
In January 2023, while an optic cable was being installed on our street, the company called Vertical Underground LLC, which we were informed was contracted by the City of Bloomington to do the job, broke our sewer line (along with the lines of many others of our neighbors). We complained to one of Vertical Underground's managers who was working on fixing our neighbor's line, and he informed us that they would fix the problem and that we didn't need to worry. In order to do the repair, they had to break through our concrete driveway to repair the damage and re-pour the damaged section of the driveway. The problem seemed to be fixed for a few months, however, these past weeks, we have been experiencing the same issues that initially led us to the discovery of the damage they caused. That is, our drains are not draining, toilets are not draining and water is returning through the shower drain. We would like to request that CBU send someone to inspect the situation because we believe that the problem was not fixed properly. Thank you.
Potholes, Other Street Repair
1010 S Highland AVE
- Case Date:
- 2/13/2019
After the last storm, water draining damaged a portion of the road in front of our house, and part of the front lawn was washed into the drainage ditch
Potholes, Other Street Repair
1008 S Lincoln ST
- Case Date:
- 9/26/2020
Utility crews cut into the road to install new water connection/meter. The patch of gravel they left behind was hastily and poorly covered with a thin layer of asphalt and is still filled with loose gravel. Cars are flinging gravel all over the street and the whole is getting larger by the day. Please address this soon, as it was a direct result of the city's actions and the poor work of city employees.
City Construction Projects
1005 S Covenanter DR
- Case Date:
- 8/11/2020
The drainage easement at the south end of Greenwood Dr., where it dead ends into the sidewalk, is blocked with a landslide of debris. The water level rose to 3 feet on either side of the sidewalk and covered three properties adjacent to the clogged drain with water and debris. Thank you for your help. Jim and Debbie Quinn
Potholes, Other Street Repair
1002 E Southdowns DR
- Case Date:
- 2/7/2019
Hi, not sure what category this goes into...at the corner of Woodlawn & Southdowns, southeast corner, there's a big culvert on the east side, and this was blocked by leaves. When I walked by this morning the ditch was 4' deep full of water and spilling over the road; on my way back a guy & his dog were trying to clear out some of the leaves. Seems like a simple leaf-rake-shovel will free that up. Kevin Pilgrim cell 812 361 7181