closed #148083
Sewer Problems (Sanitary Sewers)
3600 E Morningside DR
- Case Date:
- 9/7/2015
Drain ditch is running with brown water around entire block. Broken water line?
Drain ditch is running with brown water around entire block. Broken water line?
Sewer cleaning crew cleans every two weeks. Every time, water splashes out of the toilets.
Our toilet drains slowly. There is also a bubbling in the toilet when we run the water faucets in the powder room, the kitchen and upstairs. We noticed the problem with drainage on Monday August 28, and it has gotten worst since. There has been recent work on our easement to lay fiber lines. We are certain the issues for our toilet drainage are directly connected to the work done in the past few days. Please remedy our situation. We are not certain if we can run our showers and laundry due to the backup in our downstairs toilet.
SEWER WATER BUBBLING UP OUT OF A SEWER MANHOLE
Says street was resurfaced 1-2 years ago, changed drainage, water no longer travels to sewer, stops in front of his driveway and pools up. Says street resurfacing raised level so there's no curb and no drainage. Says he has contacted Street and Engineering before.
The street was repaved and now the water does not go to the inlet as it should. It ponds in front of the house and deposited sand into the drive entrance. The sand was from the last snows.
Sewer problems water leaking all over the apartment I1
Parking Enforcement reported water overflowing to Utilities. Linda from Utilities called to report that the clean out is overflowing in the yard at 319 N. Dunn St.
Our shower has flooded with water and fecal matter twice in the past two days.
MR. FAULTLESS CALLED MAYOR'S OFC. TO COMPLAIN ABOUT LACK OF CBU DECISION ON SEWERS ON 17TH ST. HE SAID HIS SEPTIC FAILED SO HE NEEDED DECISION ABOUT SEWER IMMEDIATELY. IF CITY DOES NOT INSTALL SEWER, MR. FAULTLESS SAID HE CAN HAVE HIS OWN SYSTEM INSTALLED. MR. FAULTLESS FELT ONE HOLDUP WAS LARGE WATER MAINS ON KINSER. MR. FAULTLESS WOULD LIKE CITY TO TRANSFER MONEY FROM ANOTHER FUND TO CORRECT PROBLEM. MR. FAULTLESS WANTED MAYOR TO FORCE UTILITIES TO MOVE AHEAD WITH PROJECT.