closed #184238

Sidewalk & Curb Complaints

1001 E 1st ST

Case Date:
6/18/2023

Overgrown vegetation on the north side of E First St is blocking the sidewalk

closed #172943

Sidewalk & Curb Complaints

1001 E Azalea LN

Case Date:
7/5/2020

There is a lot of vegetation growing across the sidewalk covering more than half the sidewalk and it's invasive stuff, so it should be pulled not just cut back. This extends along the city owned property and somewhat to the adjacent home owner's property.

closed #177021

Sidewalk & Curb Complaints

2003 S High ST

Case Date:
8/16/2021

It has been 11 weeks since Millstone tore out my driveway and the sidwalk. It is still an awful mess. 3 weeks ago I got a notice from them that they would be replacing my driveway “this week”. It is still a terrible, muddy mess that struggle to drive through. No progress on the driveways anywhere in 6 days. FFS WHEN is this going to be completed? I want my damned driveway back. It’s almost September.

closed #178062

Sidewalk & Curb Complaints

2020 E Arden DR

Case Date:
11/2/2021

There are two signs that were blocking the sidewalk all summer saying that the sidewalk ahead was closed for construction. They never served any useful purpose and the construction has been done for weeks. Someone moved them onto the grass, but they should be taken away because you can still bump your head on them.

closed #178598

Sidewalk & Curb Complaints

2105 E Arden DR

Case Date:
1/15/2022

While constructing the Bike Path on the portion of E. Arden Drive to SE Park, crews did not remove the heavy mats blocking storm drains at the corners of S. Williams, Greenfield & Sycamore Courts. When heavy rains appear, water flows into E. Arden Drive, oftentimes ponding in low lying areas. People often drive too fast on that street, causing hazardous driving conditions should they loose control of their car.

closed #177091

Sidewalk & Curb Complaints

2105 E Queens WAY

Case Date:
8/22/2021

FINSISH THIS PRJECT

closed #175987

Sidewalk & Curb Complaints

2110 S High ST

Case Date:
6/2/2021

So my driveway and the sidewalk has been completely gone for a month now, without any notice from the city. Progress... It has been replaced with loose gravel, a mess of heavy equipment traffic, and ... nothing for many weeks now. My wife cannot drive her small car over this mess without bottoming out. I haven't been able to drive my motorcycle over this mess because it's too soft for a full touring bike. The contractors spend all their time making an even bigger mess of soft gravel. Mayor Hamilton: when will you make this virue signaling mess a priority? I want my front yard back. I want my driveway back. I want my sidewalk back. FINISH IT SOON.

closed #181821

Sidewalk & Curb Complaints

2114 E Rock Creek DR

Case Date:
10/15/2022

I had previously filled issue 180907. The contractor has not contacted me regarding repair of the damaged sidewalk due to fiber installation. Could you please urge the contractor to remedy the damage to my cement pad. When they installed the fiber, they lifted the cement pad so it is no longer even with the sidewalk making it a tripping hazard.

closed #181963

Sidewalk & Curb Complaints

2114 E Rock Creek DR

Case Date:
11/1/2022

To Paul Regarding Report #181821. The area is the cement pad between the two trees between the sidewalk and street. The contractors undermined the area under the cement pad and used heavy machinary lifting the cement pad and using heavy machine causing a trip and safety hazard causing an elevation in the cement pad. Attached is a picture. I believe the contractor needs to repair this safety hazard.

closed #173559

Sidewalk & Curb Complaints

2487 S Brittany LN

Case Date:
9/1/2020

The sidewalk contruction on E Winslow Rd has been going on since winter. The project has more says with no one working on it than working on it. today I saw only 4 men on the whole project and none of them were doing any work at 11 AM. Lots of road projects in Bloomington are started and then left abandoned for months. As a resident I don't like this. If they start something they ought to work on it till finished then move on. Im frustrated with the disruption that has been going on for 7 months for a very small project.