uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (98)

closed #50554

Other

1969 S Henderson ST

Case Date:
3/30/2001

Mr. Reed stated that he conferred with Mike Bengtson re. costs before he quoted a job. Mr. Bengtson did not quote the sewer connection fee of $1,600.00. Mr. Reed requests that the sewer connection fee of $1,600.00 be returned to him because he was given misinformation.

closed #55080

Other

2311 E Covenanter DR

Case Date:
1/26/2000

Mr. Thomas sent in a letter regarding work that the cable company did in the utility easment behind his home.The cable company cut through a electic line causing damage to appliances in his home that he wishes to be re-payed for the appliances, as well as the bill from Cinergy for the repair of the electic line.The bill will be forwarded to the Construction manager. Mr. Thomas will not have to pay the bill for this, Laura will call on 2-2-00. 2-16-00, Larry Wilkerson handled complaint.

closed #57574

Other

430 S Dunn ST

Case Date:
7/2/1999

Mr. Chin copied the City of Bloomington on a letter to Insight Communications regarding incorrect billing for cancelled service.

closed #58205

Other

3110 E David DR

Case Date:
5/12/1999

See attached letter. Mr. Fritz is having problems with Channels 95, 96, 5 & 6. He talked with Scott Temple. Temple & a repairman came out and the problem seemed to be fixed. But the interference that he is having started back up. The problemed channels are mainly 95 & 96. He has called Insight frequently about this prob. The last time he called the customer service rep. stated that Temple stated that "there was nothing Insight could do, it was a spillover from the antennae off of Sare Road

closed #58952

Water Utility Billing Problems

214 E Hillside DR

Case Date:
2/23/1999

Letter from Mr. Ludwig stated that he was gone two weeks last month and his bill was doubled. He talked to Angie Grubb who had check made for leaks. None were found. Mr. Ludwig wrote to USB to have bill lowered.

closed #59168

City Construction Projects

2100 S Bent Tree DR

Case Date:
2/3/1999

Mr. Jones wrote letter dated 2/2/99 that stated that CBU crews constructed sanitary sewer thru east end of his property during 1995. The surveyor stake for the property line marker was removed and not replaced. Mr. Jones states that the easement agreement provides that the property will be returned to the original condition prior to construction work. Mr. Jones would like the marker replaced.

closed #62429

Excessive Growth

1308 E Southdowns DR

Case Date:
8/3/1998

Triangular area bounded by Southdowns, Sheridan Drive & Karen, needs dead trees, vines and weeds removed. Also, resident at 1308 Southdowns (and some others) are dumping their limbs, tree trimmings, and grass cuttings in this area. (See letter)

closed #25189

Excessive Growth

808 S Stull AVE

Case Date:
8/10/2006

Letter from neighbors saying that the yard has been un-kept for more than 2 years. See attached letter.

closed #25632

Trash

909 E 2nd ST

Case Date:
5/30/2006

Pile of sticks, logs, and yard waste on property, along with unattractive recycling center.

closed #30757

Trash

521 W Howe ST

Case Date:
5/24/2005

Trash and construction debris along the alley.